Monday, 25-07-2005

While Discovery is on the launch pad, waiting for its launch attempt
tomorrow, Atlantis is in the Vehicle Assembly Building for mating with its
external tank and solid rocket boosters. Atlantis is having some other major
work done, too - replacement of one of its three main engines.

The replacement is deemed necessary because of a problem seen during nozzle
testing at Stennis Space Center. When there are defects in cooling tubes
inside the engine bell, a special material is used to fix the defect, and it
is cured with a bakeout process that hits temperatures around 800 degrees.
On an engine that was being fixed at Stennis, a bakeout caused a
burn-through in a cooling tube, which could cause propellant to leak while
the shuttle hurtles toward orbit.

The hole prompted NASA to look at engines throughout the fleet, to see how
many had been repaired with the same process. Discovery's three engines were
cleared, but Atlantis' engine No. 1 was not. It is being removed and
replaced while the orbiter is in the vertical position in the Vehicle
Assembly Building. Removal is expected Wednesday; the work should be done
Monday, with a rollout to the launch pad scheduled for Aug. 3. Atlantis has
to be available for launch should a rescue mission be deemed necessary after
inspections of Discovery show whether its heat shield is damaged.

--
--------------

Jacques :-)

www.spacepatches.info


 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
A positive leap second will be introduced in UTC on 31 December 2005 Sam Wormley Amateur Astronomy 6 July 11th 05 05:23 PM
Cassini Update - April 15, 2005 [email protected] Astronomy Misc 0 April 15th 05 11:04 PM
Japans Moon Ambitions - They're KIDDING, Right ? Bill Bonde ( ''The chamber was in confusion, all t Policy 437 April 14th 05 12:57 PM
Cassini Update - January 7, 2005 [email protected] Astronomy Misc 3 January 9th 05 05:56 AM


All times are GMT +1. The time now is 11:23 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 SpaceBanter.com.
The comments are property of their posters.