![]() |
|
|
Thread Tools | Display Modes |
|
#1
|
|||
|
|||
![]()
Fred J. McCall wrote:
[snip] :The Russians have been transferring storable hypergolic fuel and oxidizer :from Progress tankers to their stations (including ISS) for years. No EVA ![]() Now you might want to look at the thrust developed and burn durations. I don't see any of those vehicles going to the Moon, landing, and then taking back off. So let me get this straight: scaling up from the several hundred kgs the russian progress routinely transfers to the ISS http://www.russianspaceweb.com/progress.html to the tens of tons required for a lunar mission is so complex that it can't be possibly be finished until 2018. But building a huge heavy lift vehicle out of shuttle components has negible technological risk? Orbital propellant transfer of storable propellants and even mild cryogens such as liquid oxygen and liquid methane is not that hard. There are even materials which remain flexible at liquid oxygen temperatures, so you could use a simple bladder system. It is just that nobody has ever seriously tried to do it. |
#2
|
|||
|
|||
![]() Rüdiger Klaehn wrote: Fred J. McCall wrote: [snip] :The Russians have been transferring storable hypergolic fuel and oxidizer :from Progress tankers to their stations (including ISS) for years. NoEVA ![]() Now you might want to look at the thrust developed and burn durations. I don't see any of those vehicles going to the Moon, landing, and then taking back off. So let me get this straight: scaling up from the several hundred kgs the russian progress routinely transfers to the ISS http://www.russianspaceweb.com/progress.html to the tens of tons required for a lunar mission is so complex that it can't be possibly be finished until 2018. No. The only reason for the current envisioned delay to 2018 is to allow a funding delay in developing a SDHLV due to the perceived need to continue funding shuttle until 2010. But building a huge heavy lift vehicle out of shuttle components has negible technological risk? negligable on-orbit technical risk, especially compared to on-orbit assembly and fuel transfer operations. If shuttle and ISS have proved one thing, it's that on-orbit technical risk should be traded for ground technical risk wherever possible. Orbital propellant transfer of storable propellants and even mild cryogens such as liquid oxygen and liquid methane is not that hard. says you. There are even materials which remain flexible at liquid oxygen temperatures, so you could use a simple bladder system. It is just that nobody has ever seriously tried to do it. Probably because it's just so simple. simple is boring... ;-) Tom |
#3
|
|||
|
|||
![]()
Probably because it's just so simple. simple is boring... ;-)
Given that it is nasa we are talking about here, you might have a point. Remember the reasoning for picking the lockheed proposal for the x33? They were basically arguing that the lockheed x33 required the most new technologies and therefore would be most worthwhile to do. The other proposals from rockwell and mcdonald douglas were too boring for nasa, even though they might actually have flown. |
#4
|
|||
|
|||
![]()
"Rüdiger Klaehn" wrote:
:Fred J. McCall wrote: : :[snip] : :The Russians have been transferring storable hypergolic fuel and oxidizer : :from Progress tankers to their stations (including ISS) for years. No EVA : ![]() : : Now you might want to look at the thrust developed and burn durations. : I don't see any of those vehicles going to the Moon, landing, and then : taking back off. : :So let me get this straight: This is almost a sure sign that someone is about to run down into the ditch by making claims that aren't in evidence. :scaling up from the several hundred kgs the russian progress routinely :transfers to the ISS http://www.russianspaceweb.com/progress.html to :the tens of tons required for a lunar mission is so complex that it :can't be possibly be finished until 2018. Not quite sure where I said that. I said it was not simple. If you think just increasing the size of everything solves the problem you are being QUITE simplistic in your analysis. :But building a huge heavy lift vehicle out of shuttle components has :negible technological risk? Don't know where you think I said that, either. See what I mean about running off into the ditch? :Orbital propellant transfer of storable propellants and even mild :cryogens such as liquid oxygen and liquid methane is not that hard. For some rather large and variable value of 'that hard'. :There are even materials which remain flexible at liquid oxygen :temperatures, so you could use a simple bladder system. It is just that :nobody has ever seriously tried to do it. And usually if it's something nobody has ever tried that seems like an 'obvious' idea, there is a good reason they've never tried it. -- "The reasonable man adapts himself to the world; the unreasonable man persists in trying to adapt the world to himself. Therefore, all progress depends on the unreasonable man." --George Bernard Shaw |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
NASA PDF - Apollo Experience Reports - 114 reports | Rusty | History | 1 | July 27th 05 03:52 AM |
The Apollo Hoax FAQ (is not spam) :-) | Nathan Jones | UK Astronomy | 8 | August 1st 04 09:08 PM |
The Apollo Hoax FAQ (is not spam) :-) | Nathan Jones | Astronomy Misc | 5 | July 29th 04 06:14 AM |
The Apollo Hoax FAQ | darla | Astronomy Misc | 15 | July 25th 04 02:57 PM |
The Apollo Hoax FAQ | darla | UK Astronomy | 11 | July 25th 04 02:57 PM |