June 16th 06, 04:38 PM
MARS ODYSSEY THEMIS IMAGES
June 12-16, 2006
o Feature of the Week:Snows of Udzha
http://themis.asu.edu/feature
o THEMIS ART #68 (Released 12 June 2006)
http://themis.asu.edu/zoom-20060612a
o THEMIS ART #69 (Released 13 June 2006)
http://themis.asu.edu/zoom-20060613a
o THEMIS ART #70 (Released 14 June 2006)
http://themis.asu.edu/zoom-20060614a
o THEMIS ART #71 (Released 15 June 2006)
http://themis.asu.edu/zoom-20060615a
o THEMIS ART #72 (Released 16 June 2006)
http://themis.asu.edu/zoom-20060616a
All of the THEMIS images are archived here:
http://themis.asu.edu/latest.html
NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission
for NASA's Office of Space Science, Washington, D.C. The Thermal
Emission
Imaging System (THEMIS) was developed by Arizona State University,
Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing.
The THEMIS investigation is led by Dr. Philip Christensen at Arizona
State
University. Lockheed Martin Astronautics, Denver, is the prime
contractor
for the Odyssey project, and developed and built the orbiter. Mission
operations are conducted jointly from Lockheed Martin and from JPL, a
division of the California Institute of Technology in Pasadena.
June 12-16, 2006
o Feature of the Week:Snows of Udzha
http://themis.asu.edu/feature
o THEMIS ART #68 (Released 12 June 2006)
http://themis.asu.edu/zoom-20060612a
o THEMIS ART #69 (Released 13 June 2006)
http://themis.asu.edu/zoom-20060613a
o THEMIS ART #70 (Released 14 June 2006)
http://themis.asu.edu/zoom-20060614a
o THEMIS ART #71 (Released 15 June 2006)
http://themis.asu.edu/zoom-20060615a
o THEMIS ART #72 (Released 16 June 2006)
http://themis.asu.edu/zoom-20060616a
All of the THEMIS images are archived here:
http://themis.asu.edu/latest.html
NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission
for NASA's Office of Space Science, Washington, D.C. The Thermal
Emission
Imaging System (THEMIS) was developed by Arizona State University,
Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing.
The THEMIS investigation is led by Dr. Philip Christensen at Arizona
State
University. Lockheed Martin Astronautics, Denver, is the prime
contractor
for the Odyssey project, and developed and built the orbiter. Mission
operations are conducted jointly from Lockheed Martin and from JPL, a
division of the California Institute of Technology in Pasadena.