STATUS REPORT: S05-026

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

NASA's Space Shuttle fleet is housed and processed at Kennedy Space
Center (KSC), Fla.

Discovery (OV-103)

Mission: STS-114 - 17th ISS Flight (LF1)
Payload: Multi-Purpose Logistics Module
Location: Launch Pad 39B
Launch Date: July 13, 3:51 p.m. EDT
Launch Pad: 39B
Crew: Collins, Kelly, Noguchi, Robinson, Thomas, Lawrence and Camarda
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Yesterday, the Space Shuttle Program concluded a two-day Flight
Readiness Review meeting by announcing a launch date of July 13,
2005. The next major review of launch readiness will occur two days
before launch (L-2) when the Mission Management Team meets to give
the final authorization for launch.

At Launch Pad 39B, final preparations for the launch of Discovery are
under way. Loading of hypergolic propellants continued and should be
completed this weekend. This process includes loading the propellants
monomethyl hydrazine and nitrogen tetroxide into the Orbiter
Maneuvering System and Forward Reaction Control System.

The STS-114 flight crew visited the pad yesterday to perform an
inspection for sharp edges in the orbiter. After the crew inspection
was complete, a payload contamination walkdown was performed,
closeout photos were taken and the payload bay doors were closed for
flight.

All four Extravehicular Mobility Units (EMUs) have been installed in
the orbiter. The EMU spacesuits will be worn by the flight crew
during the three spacewalks that are scheduled during the mission.

Atlantis (OV-104)

Mission: STS-121 - 18th ISS Flight (ULF1)
Payload: Multi-Purpose Logistics Module
Location: Orbiter Processing Facility Bay 1
Launch Date: Lighted Launch Planning Window September 9 - 24, 2005
Launch Pad: 39B
Crew: Lindsey, Kelly, Sellers, Fossum, Nowak, Wilson and Reiter
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Technicians continue processing Atlantis in Orbiter Processing
Facility bay 1 for its mission to the International Space Station.

Orbiter modal testing was completed this week. This test involves
using devices referred to as "shakers," which send vibrations
throughout the Orbiter. Measuring instruments called accelerometers
are positioned all over the vehicle to read the effects of the
vibrations, in order to check the structural health of the vehicle.

Early Tuesday morning, the Mobile Launch Platform carrying the STS-121
External Tank (ET-120) and twin Solid Rocket Boosters was moved from
High Bay 1 in the Vehicle Assembly Building to High Bay 3. The move
was made to allow for modification work to take place in High Bay 1.

Endeavour (OV-105)

Endeavour is in its Orbiter Major Modification period which began in
December 2003.

Previous Space Shuttle processing status reports are available on the
Internet at:

http://www.nasa.gov/returntoflight

For information about NASA and agency programs on the Internet, visit:


http://www.nasa.gov/


-end-


--
--------------