Ron
September 17th 04, 07:02 PM
MARS ODYSSEY THEMIS IMAGES
September 13-17, 2004
o Ius Chasma Ridge (Released 13 September 2004)
http://themis.asu.edu/zoom-20040913a.html
o Hebes Chasma (Released 14 September 2004)
http://themis.asu.edu/zoom-20040914a.html
o Ophir Chasma Dunes (Released 15 September 2004)
http://themis.asu.edu/zoom-20040915a.html
o Hebes Chasma Mosaic (Released 16 September 2004)
http://themis.asu.edu/zoom-20040916A.html
o Ophir Chasma Rim (Released 17 September 2004)
http://themis.asu.edu/zoom-20040917a.html
All of the THEMIS images are archived here:
http://themis.la.asu.edu/latest.html
NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission
for NASA's Office of Space Science, Washington, D.C. The Thermal Emission
Imaging System (THEMIS) was developed by Arizona State University,
Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing.
The THEMIS investigation is led by Dr. Philip Christensen at Arizona State
University. Lockheed Martin Astronautics, Denver, is the prime contractor
for the Odyssey project, and developed and built the orbiter. Mission
operations are conducted jointly from Lockheed Martin and from JPL, a
division of the California Institute of Technology in Pasadena.
September 13-17, 2004
o Ius Chasma Ridge (Released 13 September 2004)
http://themis.asu.edu/zoom-20040913a.html
o Hebes Chasma (Released 14 September 2004)
http://themis.asu.edu/zoom-20040914a.html
o Ophir Chasma Dunes (Released 15 September 2004)
http://themis.asu.edu/zoom-20040915a.html
o Hebes Chasma Mosaic (Released 16 September 2004)
http://themis.asu.edu/zoom-20040916A.html
o Ophir Chasma Rim (Released 17 September 2004)
http://themis.asu.edu/zoom-20040917a.html
All of the THEMIS images are archived here:
http://themis.la.asu.edu/latest.html
NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission
for NASA's Office of Space Science, Washington, D.C. The Thermal Emission
Imaging System (THEMIS) was developed by Arizona State University,
Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing.
The THEMIS investigation is led by Dr. Philip Christensen at Arizona State
University. Lockheed Martin Astronautics, Denver, is the prime contractor
for the Odyssey project, and developed and built the orbiter. Mission
operations are conducted jointly from Lockheed Martin and from JPL, a
division of the California Institute of Technology in Pasadena.