The 2nd Schomburg email I refer to in #3 is in response to a
discussion started by L. Ham who asked in an email if they could make
the following blanket statement:

"No safety of flight damage" for ANY ET foam loss due to foam density.

This idea, that any foam hit could not possibly be a safety of flight
risk, seems to be drawn from the process of performing a flight
readiness review after STS-112 (also had bi-pod foam fall off). This
explains partly why managers were so unconcerned with the foam strike
and so rock-solid sure that it was a turnaround issue without any good
analysis to prove so.

(see Chap. 6, pg. 154 of the CAIB final Report for the email:
-----Original Message---
From: HAM, LINDA J. (JSC-MA2) (NASA)
Sent: Wednesday, January 22, 2003 9:33 AM
To: AUSTIN, LAMBERT D. (JSC-MS) (NASA); ROE, RALPH R. (JSC-MV) (NASA)
Subject: ET Foam Loss
Can we say that for any ET foam lost, no ‘safety of flight' damage can
occur to the Orbiter because of the density?")

(see Chap. 6, pg. 126 of the CAIB final Report: "During the brief at
STS-113's Flight Readiness Review, the Associate Administrator for
Safety and Mission Assurance scrutinized the Integration Hazard Report
37 conclusion that debris-shedding was an accepted risk, as well as
the External Tank Project's rationale for flight. After conferring,
STS-113 Flight Readiness Review participants ultimately agreed that
foam shedding should be characterized as an "accepted risk" rather
than a "not a safety-of-flight" issue. Space Shuttle Program
management accepted this rationale, and STS-113's Certificate of
Flight Readiness was signed.")

(see Chap. 6, pg. 125 of the CAIB final Report: "Because the bipod
ramp shedding on STS-112 was significant, both in size and in the
damage it caused, and because it occurred only two flights before
STS-107, the Board investigated NASA's rationale to continue flying.
This decision made by the Program Requirements Control Board at the
STS-113 Flight Readiness Review is among those most directly linked to
the STS-107 accident. Had the foam loss during STS-112 been classified
as a more serious threat, managers might have responded differently
when they heard about the foam strike on STS-107. Alternately, in the
face of the increased risk, STS-107 might not have flown at all.
However, at STS-113's Flight Readiness Review, managers formally
accepted a flight rationale that stated it was safe to fly with foam
losses. This decision enabled, and perhaps even encouraged, Mission
Management Team members to use similar reasoning when evaluating
whether the foam strike on STS-107 posed a safety-of-flight issue.")

Ellen
 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
The Best Part #2 of CAIB Report ElleninLosAngeles Space Shuttle 5 August 29th 03 06:40 PM
The Best Part #3 of CAIB Report ElleninLosAngeles Space Shuttle 0 August 28th 03 12:30 AM
KSC director media opportunity regarding CAIB report set for Aug. 27 Jacques van Oene Space Shuttle 0 August 26th 03 09:33 AM
Never mind the shuttle crash, the real threat is the CAIB report Rand Simberg Space Shuttle 130 August 25th 03 06:53 PM
DEATH DOES NOT EXIST -- Coal Mine Rescue Proves It Ed Conrad Space Shuttle 4 August 2nd 03 01:00 AM


All times are GMT +1. The time now is 11:02 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 SpaceBanter.com.
The comments are property of their posters.