Cassini Significant Events
for 09/29/05 - 10/05/05

The most recent spacecraft telemetry was acquired Wednesday, October 5,
from
the Canberra tracking stations. The Cassini spacecraft is in an
excellent
state of health and is operating normally. Information on the present
position and speed of the Cassini spacecraft may be found on the
"Present
Position" web page located at
http://saturn.jpl.nasa.gov/operation...t-position.cfm .

Thursday, September 29 (DOY 272):

In last week's report it was mentioned that the project had decided to
go
after the approximately 88Mb of data lost during the Hyperion DSS-14
70m
playback on DOY 270. After discussions with Spacecraft Operations,
Mission
Planning, Science Planning, Program Management, and the sequence leads,
the
strategy selected was to move the SSR-B record and playback pointers to
protect the Hyperion data. The necessary files were radiated on DOY
272 to
move these pointers. CDS confirmed via telemetry that the pointers had
moved
to the correct positions. The data will be played back during the DOY
277
DSS-14 track, Tuesday, October 4.

A Cassini Design Team meeting was held to review the Team/Office
baseline
development plans for the Spring 2006 version D12 Mission Sequence
Subsystem
delivery. The purpose of the meeting was to ensure a common
understanding
of the capabilities being planned and the rationale behind the
priorities
that have been established, to understand the schedule constraints, and
to
obtain project management approval of the plan.

It has been decided to cancel the S16 simulation coordination and
procedure
review meetings since no activities have been identified that require
simulation in the Integrated Test Laboratory prior to sequence uplink.

Science Planning chaired the S16 Science Allocation Planning meeting
today
for the purpose of distributing available sponge bits amongst
interested
parties. Sponge bits represent available data volume that is given away
to
the teams at this stage in the Science and Sequence Update process. The
sequence leads do not expect any further changes to DSN allocation, so
much
of the data volume that was being held as margin is given to the teams
for
science. Prior to the meeting, the Science Planning lead determines how
much
extra data volume is available and teams request the data volume that
they
need. If more data volume is requested than is available, negotiations
are
made during the meeting. In this instance 18.5 Gbits of data were
available
and there were no conflicts.

Friday, September 30 (DOY 273):

SOST hosted a Dione/Rhea preview meeting. Planned science objectives
and
activities were presented.

JPL Media Relations has released an image advisory on the recent Tethys
and
Hyperion flybys. This was the closest flyby to date of both bodies.
Tethys
has a scarred, ancient surface, while Hyperion is a strange,
spongy-looking
body with dark-floored craters that speckle its surface. For more
information go to http://saturn.jpl.nasa.gov.

Monday, October 3 (DOY 276):

A Titan Atmospheric Working Group meeting was held today to discuss the
Titan 7 flyby data and implications for future Titan flyby altitudes.

An amazingly clear picture of Hyperion is Astronomy Picture of the Day
today.

The sequence leads began uplink of the Instrument Expanded Block files
in
support of the S15 sequence. Five files were sent. S15 will begin
execution
on board the spacecraft on Saturday, October 8.

Tuesday, October 4 (DOY 277):

SSR partition B4 has completed playback and it has been confirmed that
the
lost RADAR data between 269T06:00:16 and 269T06:21:49 has been
replayed. The
RADAR team sent a message to program members announcing that all the
missing
Hyperion data, 85 Mbits of science and engineering packets, and 0.02
Mbits
housekeeping, have been received.

Final sequence development for S17 began today with a kick off meeting.
Initial sequence products will be released for review later today.

An encounter strategy meeting was held today for the Dione 1 through
Titan 8
flybys. This covers the period from October 11 through October 28, and
includes Orbit Trim Maneuvers 38-40.

Wrap up:

Check out the Cassini web site at http://saturn.jpl.nasa.gov for the
latest
press releases and images.

The Cassini-Huygens mission is a cooperative project of NASA, the
European
Space Agency and the Italian Space Agency. The Jet Propulsion
Laboratory, a
division of the California Institute of Technology in Pasadena, manages
the
Cassini-Huygens mission for NASA's Science Mission Directorate,
Washington,
D.C. JPL designed, developed and assembled the Cassini orbiter.

 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Cassini Update - June 17, 2005 [email protected] Astronomy Misc 0 June 17th 05 08:08 PM
Space Calendar - March 25, 2005 [email protected] Astronomy Misc 0 March 25th 05 03:46 PM
Space Calendar - March 25, 2005 [email protected] History 0 March 25th 05 03:46 PM
Cassini Update - January 7, 2005 [email protected] Astronomy Misc 3 January 9th 05 05:56 AM
Cassini Update - October 29, 2004 Ron Astronomy Misc 0 October 29th 04 08:21 PM


All times are GMT +1. The time now is 05:16 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 SpaceBanter.com.
The comments are property of their posters.