A Space & astronomy forum. SpaceBanter.com

Go Back   Home » SpaceBanter.com forum » Space Science » News
Site Map Home Authors List Search Today's Posts Mark Forums Read Web Partners

Cassini Update - July 9, 2009



 
 
Thread Tools Display Modes
  #1  
Old July 10th 09, 01:52 AM posted to sci.space.news
ron
external usenet poster
 
Posts: 269
Default Cassini Update - July 9, 2009

Cassini Significant Events
for 06/30/09 - 07/07/09

Information on the present position and speed of the Cassini
spacecraft may be found on the "Present Position" page at:
http://saturn.jpl.nasa.gov/operation...t-position.cfm.

The most recent spacecraft telemetry was acquired on July 7 from the
Deep
Space Network tracking complex at Goldstone, California. The Cassini
spacecraft is in an excellent state of health and all subsystems are
operating normally.

Tuesday, June 30 (DOY 181)

The Ultraviolet Imaging Spectrograph (UVIS) performed Saturn system
scans
for six out of the eight reporting days this week to observe atomic
oxygen
and hydrogen. Imaging Science (ISS) observed various satellites with
the
narrow angle camera as part of an ongoing satellite orbit campaign,
and the
Composite Infrared Spectrometer (CIRS) performed observations to
quantify
the amount of polarization present in the thermal infrared emission of
the
rings. The purpose of this observation was to gain insight into the
regolith
properties of ring particles, their shape, and the "clumpiness" of
ring
particles.

Orbit Trim Maneuver (OTM) #204 was performed today. This is the
apoapsis
maneuver setting up for the Titan 58 encounter on July 8. The
reaction
control subsystem burn began at 6:45 pm PDT. Telemetry immediately
after the
maneuver showed the burn duration was 9.13 seconds, giving a delta-V
of
16.04 mm/s. All subsystems reported nominal performance after the
maneuver.

Today is the first anniversary of the completion of the Cassini Prime
Mission and completes the first year of the Cassini Equinox Mission.

The Cassini-Huygens Analysis and Results of the Mission (CHARM)
teleconference for June addressed the topic: " Cassini Huygens
Mission to Saturn Fifth
Anniversary," Part 1 - Highlights of Saturn and Saturn's
Magnetosphere. A copy of the
presentation is available at:
http://saturn.jpl.nasa.gov/video/pro...ProductsCharm/

Wednesday, July 1 (DOY 182)

An encounter strategy meeting was held today to cover the period
between
July 8 and July 24, Titan flybys T58 and T59, and maneuvers 206-208.


Thursday, July 2 (DOY 183):

The Visual and Infrared Mapping Spectrometer (VIMS) performed a "solar
port
to sun" instrument calibration today, and then a stellar calibration
with
Alpha Centauri as the target.


Friday, July 3 (DOY 184):

As a consequence of the excellent accuracy achieved with OTM #204, a
bias in
the time of closest approach to T58 would have been needed to be
designed
into the OTM #205 maneuver commands in order to have the delta-V
magnitude
reach the minimum maneuver size. As a result of this modification,
performing the maneuver would have caused a larger arrival time miss
at T58
than canceling the maneuver altogether. Therefore, OTM-205 was
canceled.

From Friday through Sunday, instrument activities included a 6-hour
Magnetometer calibration roll, magnetospheric boundary campaign
observations, a CIRS far-IR mapping scan of the northern hemisphere of
Saturn to determine hemispheric thermal structure of the upper
troposphere,
a Titan cloud monitoring campaign, and an observation of the rings to
map
the thermal emission at a variety of viewing geometries to help
understand
ring particle properties and ring dynamics.

Monday, July 6 (DOY 187):

S53 has entered the Preliminary Sequence Integration and Validation
(PSIV)
portion of the last sequence development process prior to uplink.
Cycle 1
products have been distributed to the flight team for review. In
addition,
RADAR has requested simulation in the Integrated Test Laboratory (ITL)
for a
synthetic aperture RADAR activity during the T61 flyby. The first
meeting
to support this activity will occur tomorrow with personnel from the
Spacecraft Office, ITL, and RADAR along with the sequence leads
participating. Finally, the PSIV Science Allocation Panel meeting has
been
cancelled, as negotiations for DSN tracks during execution are not yet
complete.

Visit the JPL Cassini home page for more information about the
Cassini Project: http://saturn.jpl.nasa.gov/

 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Cassini Update - July 2, 2009 ron News 0 July 2nd 09 07:40 PM
CFP with extended deadline of Mar. 23, 2009: The 2009 InternationalConference on Scientific Computing (CSC'09), USA, July 13-16, 2009 A. M. G. Solo Astronomy Misc 0 March 17th 09 01:14 AM


All times are GMT +1. The time now is 03:40 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 SpaceBanter.com.
The comments are property of their posters.