![]() |
|
|
Thread Tools | Display Modes |
#1
|
|||
|
|||
![]()
Ball Aerospace & Technologies Corp.
Contact: (303) 533-6059 Jan. 8, 2007 Ball Aerospace/NASA Achieve Key Technology Milestone for James Webb Space Telescope Boulder, Colo. -- A team of engineers from Ball Aerospace & Technologies Corp. and NASA have successfully met the criteria needed to demonstrate Technology Readiness Level 6 (TRL-6) for the Wavefront Sensing and Control for the James Webb Space Telescope, a measure used by NASA to assess the maturity of evolving technologies. The Ball Aerospace-built one-meter James Webb Space Telescope Testbed, designed to mature the telescope's critical subsystems and reduce risk, was used to demonstrate the critical end-to-end Wavefront Sensing and Control (WFS&C) process. A TRL-6 level rating means a system has been tested successfully in a relevant operational environment. This milestone proves the maturity of sophisticated image process and control software that will be needed to bring JWST into alignment following launch. Ball Aerospace is the principal optical subcontractor for the JWST program, led by prime contractor Northrop Grumman Space Technology, under a contract from the NASA Goddard Space Flight Center, in Greenbelt, MD. The software and algorithm technology that achieved this major milestone was developed by a team of engineers from Ball Aerospace, NASA's Goddard Space Flight Center, and the Jet Propulsion Laboratory. The size of the JWST telescope requires that it be launched in a stowed or folded configuration and unfolded following space deployment. As a result, the primary and secondary mirrors will be aligned on orbit, making the accuracy of JWST's WFS&C all the more critical. Once on orbit, imagery from a science camera aboard JWST is down-linked to Earth, where algorithms determine the optimal positions for the 19-mirror segments (18 primary mirror segments plus the secondary mirror). Resultant commands are then up-linked to phase the telescope. "The same technological ingenuity Ball Aerospace applied to correcting the Hubble Space Telescope's primary mirror in 2002 is being applied to advancing the optics for the JWST observatory," said David L. Taylor, president and chief executive officer of Ball Aerospace & Technologies Corp. The 6.6-meter JWST is designed to study infrared light from objects that formed in the beginning of the universe. It will be the first civilian space-based observatory to use an actively controlled, segmented mirror architecture when launched in 2013. The primary mirror segment assembly passed the milestone necessary to demonstrate Technology Readiness Review (TRL) 6 in 2006. Ball Aerospace celebrated its 50th year in business in 2006. The company began building pointing controls for military rockets in 1956, and later won a contract to build one of NASA's first spacecraft, the Orbiting Solar Observatory. Over the years, the company has been responsible for numerous technological and scientific firsts' and now acts as a technology innovator for important national missions. Ball Corporation is a supplier of high-quality metal and plastic packaging products and owns Ball Aerospace & Technologies Corp. Ball reported 2005 sales of $5.8 billion and employs 15,600 people. IMAGE CAPTION: [http://www.ballaerospace.com/media/i...wst_mirror.jpg (3.56MB)] A Ball Aerospace engineer inspects the James Webb Space Telescope testbed. (Ball Aerospace & Technologies Corp.) |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
James Webb Space Telescope is a boondoggle | Andrew Nowicki | Astronomy Misc | 38 | February 24th 05 07:48 AM |
James Webb Space Telescope is a boondoggle | Andrew Nowicki | Policy | 37 | February 24th 05 07:48 AM |
James Webb Space Telescope maintenance | Andrew Nowicki | Science | 1 | June 5th 04 07:32 PM |
James Webb Space Telescope | Alan Erskine | Policy | 7 | February 10th 04 12:16 AM |
NASA Issues Modification to James Webb Space Telescope Contract | Ron Baalke | Misc | 0 | September 4th 03 12:49 AM |