A Space & astronomy forum. SpaceBanter.com

Go Back   Home » SpaceBanter.com forum » Astronomy and Astrophysics » Hubble
Site Map Home Authors List Search Today's Posts Mark Forums Read Web Partners

Daily Report #4862



 
 
Thread Tools Display Modes
  #1  
Old June 9th 09, 03:00 PM posted to sci.astro.hubble
Cooper, Joe
external usenet poster
 
Posts: 568
Default Daily Report #4862


HUBBLE SPACE TELESCOPE - Continuing to collect World Class Science

DAILY REPORT #4862

PERIOD COVERED: 5am June 8 - 5am June 9, 2009 (DOY 159/0900z-160/0900z)

OBSERVATIONS SCHEDULED

ACS/WFC/S/C 11811

ACS CEB-R Optimization Iteration 3

During the early weeks of SMOV the ACS-R team will work to find the best
parameters for CEB-R and the WFC CCD operations before continuing with the
normal SMOV activities and eventually enable science operations. This
optimization needs to be done in an iteratively way. The plan is to have up
to eight iterations spread out through SMOV week 2-4. A core-set of
observations aimed to assess the performance of the CCDs and to check the
relative phasing between the internal ASIC signal and the incoming video
signal will be repeated in all iterations. In any given iteration a specific
test will be run to determine the best value for a given parameter. Data
collected in each iteration will be quickly analyzed and if needed, new
parameters will be uploaded in real time before the following iteration. The
data will consist of a mix of normal data (bias, flat, EPER, darks) and
O-mode data. In order to facilitate the program implementation, data
collection and reduction, the program will be implemented in eight different
proposals. 11811 covers the third iteration.

COS05/NUV 11466

NUV Detector Dark

Measure the NUV detector dark rate by taking long science exposures with no
light on the detector. The detector dark rate and spatial distribution of
counts will be compared to pre-launch data in order to verify the nominal
operation of the detector, and for use in the CalCOS calibration pipeline.
Variations of count rate as a function of orbital position will be analyzed
to find dependence of dark rate on proximity to the SAA.

COS23/FUV/S/C 11356

COS FUV Initial On-Orbit Turn-On

This proposal specifies the procedure for SMOV initial HV turn-on and
ramp-up of the COS FUV detector. (The FUV will have been commanded to its
Operate state to support execution of proposal 11353.) The procedure is
detailed in the Observing Description, but in summary, the following is
done: The initial transition from FUV Operate to HVLow is broken into two
parts, with a gap of 4 hours between turning on the HV and ramping to the
HVLow (SAA) voltage. This will be followed by 5 cycles of HV ramp-up and
return to HVLow. Cycles will ramp up to successively higher (magnitude)
voltage, with the fifth cycle going to the nominal operating values. There
will be a gap of at least 4 hours between cycles. All HV ramp-up will be
done at 10 sec per HV "step". The step rate and cycle voltage values (for
Segments A and B) must be patched in FSW in each cycle prior to the HV ramp
commanding. Memory monitors will be set on the patched memory locations.
Immediately after any HV commanding, and 4 hours after ramp-up commanding,
the DCE memory will be dumped. Immediately after HV ramp-up commanding
higher than HVLow, short DARK & WAVE exposures will be obtained. Visits 01
and 02, and all the subsequent even numbered visits (the ones 4 hours after
HV ramp-ups), end with NSSC-1 COS event flag 3 being set. If the flag
remains set, subsequent FUV commanding will be skipped. Thus, Operations
Requests must be in place to clear the flag prior to those subsequent
visits. Real-time monitoring of the telemetry will be used to guide the
decisions whether or not to clear the flag. The final visit (13) provides a
scheduled final opportunity to clear flag 3, and if the flag is cleared,
initiates nominal FUV HV commanding and requests a DARK exposure.

FGS/S/C 11458

Optimizing FGS2R2 Performance with the AMA

This proposal satisfies SMOV4 AD OTA/FGSS-054. S-curves with PUPIL and F583W
will be obtained at selected locations within the FGS2R2 FOV during SMOV4.
These data will be will be used to adjust the AMA so as to align the HST
pupil onto the interferometer's Koesters prisms. The final AMA position will
be set to produce an acceptable set of S-curves across the FGS2R2 FOV. The
AMA will be adjusted using CCL/instructions from the ground. It is intended
that this proposal executes during the SMOV4 BEA and will require several
(on the order of 4) iterations to achieve optimal interferometric
performance.

STIS07/CCD 11404

CCD Dark and Bias Monitor for SMOV4/Cycle 17 Activity STIS-07

Monitor the darks for the STIS CCD. Monitor the bias in the 1x1, 1x2, 2x1,
and 2x2 bin settings at gain=1, and 1x1 at gain = 4, to build up high-S/N
superbiases and track the evolution of hot columns.

STIS18/S/C 11351

NUV MAMA HV Recovery

This proposal addresses the concerns over Cesium migration from the NUV-MAMA
photocathode into the pores of the microchannel plate and lays out the
procedures necessary to permit a safe and controlled recovery of the
NUV-MAMA detector to science. This procedure should only be used during the
SMOV4 high voltage recommissioning phase for the NUV-MAMA. After, the normal
ramping procedure should be used. This proposal is loosely based on proposal
10036, STIS MAMA Anomalous Recovery, with the differences summarized below:
(1) additional plateaus during voltage commanding, (2) longer dwells after
each 50 V step, (3) intermediate ramp re-structured into 2 parts, (4) change
in yellow and red limits and the MCP Hi limit, setting new values for the
next plateau, and (5) adding a fold test at 300V below the nominal MCP
voltage. The recovery consists of four separate procedures (visits) and they
must be completed successfully and in order. They a (1) a signal
processing electronics check, (2) 1st high voltage ramp-up to an
intermediate MCP voltage of -1500 V with limits modifications and voltage
plateaus, (3) 2nd high voltage ramp-up to an intermediate MCP voltage of
-1750 V (300 V below the nominal MCP voltage) with limits modifications and
voltage plateaus followed by a fold distribution test, and (4) a final high
voltage ramp-up to the full operating voltage, again with limits
modifications and voltage plateaus, followed by a fold distribution test.
During the 1st high voltage ramp-up, diagnostics are performed followed by a
dark exposure. During the 2nd and 3rd high voltage ramp-ups, diagnostics are
performed followed by a dark, flat field ACCUMs, and a fold analysis test.
All required parameters are defined in 07-248 FUV and NUV SMOV Ramp-up
Parameters Excel workbook. Supports Activity STIS-18

WFC3/S/C 11454

Activation Test

This program (WFC3 SMOV program WFC3-01) verifies that WFC3 is in the same
condition after release from the Shuttle as during the Functional Test (FT),
which was conducted with HST in the Shuttle's payload bay. This analog test
will be implemented in stored commanding that will be generated from a Phase
II proposal, whereas the in-bay FT was run with real-time CCLs.

The purpose of the FT was to demonstrate that WFC3 is viable for scientific
research. This was accomplished by demonstrating that WFC3 can be commanded
to the nominal scientific operating state and can carry out nominal
scientific operations of the UVIS and IR channels, including operation of
the thermoelectric coolers (TECs), corrector and focus mechanisms, UVIS
shutter, SOFA and FSM filter wheels, detectors, and Control Section (CS).
Only one Side of the CS is verified.

This test is compatible with execution during the post-FT, Safe-Protect
period. Operability of the TECs is not demonstrated in this test, but is
demonstrated in the SMOV Detector & TEC activation programs, WFC3-04 and
WFC3-05.

FLIGHT OPERATIONS SUMMARY:

Significant Spacecraft Anomalies: (The following are preliminary reports of
potential non-nominal performance that will be investigated.)

HSTARS: (None)

COMPLETED OPS REQUEST:

18498-0 - Clear COS Event Flag 3 after FUV initial turn on Part 3-1
completes @ 159/1341z
18476-0 - WFC3 Transition Heaters From Protect to Normal @ 159/1820z

COMPLETED OPS NOTES: (None)

SCHEDULED SUCCESSFUL
FGS GSAcq 6 6
FGS REAcq 4 4
OBAD with Maneuver 3 3

SIGNIFICANT EVENTS:

Flash Reports:

-At 159/1819 WFC3 was successfully transition from Protect Operate to
Operate.

-At 159/19:38z COS FUV HV was partially ramped to HVNom -5010/-4963V volts)
on both segment A and B respectively.


 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Daily Report Cooper, Joe Hubble 0 December 22nd 08 05:17 PM
Daily Report #4666 Cooper, Joe Hubble 1 September 11th 08 10:29 PM
Daily Report #4665 Cooper, Joe Hubble 0 August 1st 08 04:45 PM
Daily Report [email protected] Hubble 0 October 29th 04 04:59 PM
HST Daily Report 131 George Barbehenn Hubble 0 May 11th 04 02:48 PM


All times are GMT +1. The time now is 06:49 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 SpaceBanter.com.
The comments are property of their posters.