ISS On-Orbit Status 1 Apr 2004

All ISS systems continue to function nominally, except those noted
previously or below. (April Fool's Day message to the crew: "We're going to
have you go EVA tomorrow for some pictures of the TRRJ...")

CDR/SO Michael Foale completed the regular periodic inspection of smoke
detectors in the Lab module, Airlock (A/L) and Node.

Later, Mike also conducted the monthly PEP (portable emergency provisions)
inspection, verifying that PFEs (portable fire extinguishers), PBAs
(portable breathing apparatus), QDMs (quick-don masks) and the oxygen
extension hose tee kit are all free of damage, to ensure their
functionality. [There are a total of five PBAs in the USOS, viz., two in
Node lockers, two in Lab module forward and aft endcone lockers, and one in
the Airlock PEP locker.]

FE Alexander Kaleri performed the periodic leakage inspection of the two
foam applicators in the ISS Leak Patch Kit. [The inspection is done wearing
protective gear in case the foam substance, of toxicity level 1, has leaked
from the applicator inside the kit.]

The crew began equipment transfer to and loading operations in
Progress-260/13P for disposal, using a newly uplinked list of hardware
identifications, ISS stowage locations, and recommended accommodations in
the cargo ship-turned-trash remover.

Kaleri completed requested photography of window #13 in the Service Module
(SM), which on 3/19 was found by the crew to have acquired a new impact
crater of about 2.5 mm diameter and a scratch. [The defects were not present
on previous pictures. Alex took several shots, with a ruler taped to the
window frame for scale reference. Window #13 is one of three in the small
conical transition segment from the PkhO Transfer Compartment, measures 22.8
cm in diameter and is protected by a manually driven external cover.]

After Mike Foale had reconnected the UOP-DCP (utility outlet
panel-to-display & control panel) bypass power cable at the Lab RWS
(robotics workstation) in the morning and the ground had powered up the MSS
(Mobile Service System) and its video equipment, Foale took the SSRMS (Space
Station Remote Manipulator System) through the scheduled proficiency
training session. One hour was reserved for set up and review of the
Dynamic Operational Ubiquitous Graphics (DOUG) application and for general
preparations, leaving two hours for the actual operations, which were
executed without hitch. [The procedure's objective was an outside inspection
with the MSS video cameras of the CDRA/MISSE area, to check for ice
collection around the CDRA (CO2 Removal Assembly) vent nozzle and inspect
the MISSE (Materials ISS Experiment), extensive surveys of the ISS nadir
side, inspection of more H-Fixtures on the P1 truss outboard and inboard,
and inspection of the P6 forward PVR (photovoltaic radiator), where a bubble
has been discovered under the fabric on the base structure. The surveys
were recorded on board for downlink later. MCC-H managed the VTRs (video
tape recorders) and routed to them.]

Alex Kaleri ran a test on the new LT1 (laptop 1) at the SM Central Post,
after initializing the laptop's BIOS settings, to check on its network
connectivity, i.e., its communication with the Russian KTsP1 (Central Post
Computer 1). [Depending on the outcome, Sasha was to either turn LT1 off as
per nominal deactivation procedure, or to replace it with LT3 and activate
the latter. Early indications are that the test went "nominal".]

Later, the FE performed the regular once-a-week maintenance reboot on the
operational portable (PCS) laptops and also restarted the SSC OCA comm
router laptop (normally every two weeks).

Sasha downloaded data and imagery collected of the BIO-5 Rasteniya-2
("Plants-2") experiment to the computer for subsequent downlink to the
ground. [Rasteniya studies growth and development of plants (peas) under
spaceflight conditions in the Lada-4 greenhouse.]

Sasha also attended to the daily routine maintenance of the SM's SOZh life
support system (including ASU toilet facilities).

At 3:55am EST, the crew downlinked greetings and answers to questions for
replay on the "Good Morning" news (vesti) program on the Rossia TV channel
in Moscow. ["Six months spent on the ISS are behind you. Which month was
the most challenging, and which was the most successful and most interesting
to you?"; "What do you think about space tourism? Do you need to have a
dedicated crewmember as a full-time ISS tour guide?" and finally: "Spasibo!
Do svidaniya!"]

At 12:25pm, the crew conducted an interactive educational PAO exchange with
students at the Center of Science and Industry (COSI) in Columbus, OH, which
is headed by former Shuttle astronaut (and first US woman to conduct an EVA)
Dr. Kathryn Sullivan. [Student questions had been uplinked beforehand, and
the crew had prepared tools and a tools block to demonstrate their use.
("How much force is needed to drive a nail into a piece of wood and how does
it differ from a hammer used on Earth?"; "How is using a screwdriver (or a
wrench) in space different than on Earth?"]

Later in the day, at 1:25pm, CDR Foale had a 10-min. amateur/ham radio
exchange with pupils at two schools, Jacques Prevert and Georges Brassens,
in Saint Mard, France. [The schools have set up a technical/scientific
workshop called "Syntheses 3D" last year to allow the students to get "hands
on" experience with satellites and the ISS, by learning radio technology and
using computers equipped with 3D animation and modeling software.]

The CDR conducted his periodic teleconference with the Increment 9 crew
(Gennady Padalka, Mike Fincke, Andrė Kuipers), via audio/phone patch on
S-band.

Mike and Sasha conducted their regular daily physical exercise program of
2.5 hrs on TVIS treadmill, CEVIS bike, RED exerciser and VELO cycle with
load trainer. Kaleri received special recommendations from TsUP on the use
of the TVIS with SLDs (subject load devices) and the Russian TNK loading
suit, with the desired axial load setting during the final flight stage.

At 1:30pm, MCC-Houston remote-commanded a swap ofthe U.S. guidance,
navigation & control computers (GNC MDMs) from primary to backup, to upload
a software patch to the GNCs that will allow them to accept more RGA (rate
gyro assembly) rate data, thus improving the overall performance of the US
attitude determination system. [Both MDMs were loaded, then reconfigured and
recovered. Preparatory to the swap-out, at 12:55pm, attitude control
authority was handed over to the Russian MCS (motion control system), which
maneuvered the station to LVLH minimum prop attitude, then to LVLH TEA
(torque equilibrium attitude), prior to returning authority directly to the
U.S. momentum management controllers at 4:20pm, using the new CMG-protecting
procedure.]

TsUP/Moscow is conducting a test of the Regul-Paket comm system, to
troubleshoot problems of the "loopback mode", i.e., the return link from ISS
to TsUP. Crew involvement was/is not required, except for Kaleri starting
up the Paket laptop with the appropriate application this morning.
Rebooting the laptop tomorrow morning will automatically restore normal ops.

U.S. testing of the TRRJ (thermal radiator rotary joint) software continues,
and lessons are being learned. [Specialists are currently looking into the
repeated failure of the software to switch over from thermal loop A to loop
B when the responsible FDIR (failure detection, isolation, and recovery)
system perceives a string failure (in this case test-commanded, i.e.,
simulated).]

The BCAT-3 (Binary Colloidal Alloy Test 3) experiment has progressed at a
much faster rate of the phase separation of the samples than anticipated,
and the investigators are hoping for an additional photo session to better
understand the time scale at work within them.

Correction to yesterday's report on the Orlan-M checkout: Increment 9 will
feature only two (not three) Russian Orlan EVAs, to wit:


EVA-10 (7/22/04) -- for installing protective elements on the DC-1's
circular handrails as well as soft handrails on DC-1, conducting experiment
activities (Kromka, Platan-M), and preparing for ATV docking (part 1);


EVA-11 (8/24/04) -- for replacing a removable panel for a liquid flow
regulator on the FGB, installing four fairleads on FGB handrails as well as
a plume impingement & deposit monitoring unit, and preparing for ATV docking
(part 2).

Today's CEO (Crew Earth Observations) targets, in the current LVLH attitude
no longer limited by flight rule constraints on the use of the Lab
nadir/science window, except for the shutter closure and
condensation-prevention plan (limited to 90 min. in 24 hours), were Ganges
River Basin (looking eastward, to the right of track, for oblique views of
the regional smog and haze layer. Trying for views which indicate the
thickness of these aerosols as referenced against the darker wall of the
Himalayan Massif), Amman, Jordan (a nadir pass over the Jordanian capital
located about 40 miles northeast of the Dead Sea), Brasilia, Brazil (the
pass should have been early enough to beat the cumulus field produced by
daytime heating. Looking just right of track for the unusual pattern of
this city on a lake), and Chicago, Illinois (the Windy City forecast was for
clearing by the time of the ISS pass. Looking just right of track as the
station approached Lake Michigan from the SW.)

CEO images can be viewed at the websites.

http://eol.jsc.nasa.gov
http://earthobservatory.nasa.gov

See also the website "Space Station Challenge" at

http://voyager.cet.edu/iss/

U.S. and Russian Segment Status (as of today, 2:51pm EST).


Environmental Control and Life Support (ECLSS) and Thermal Control (TCS):
Elektron O2 generator is On. Vozdukh CO2 scrubber is On. U.S. CDRA CO2
scrubber is on Standby (ready in dual-bed mode). TCCS (trace contaminant
control subsystem) is operating. SM Gas Analyzer has been calibrated and is
used for ppO2 and ppCO2 monitoring. MCA (major constituents analyzer) is in
Life Extending Mode (LEM). BMP Harmful Impurities unit: absorbent bed #1 in
Purify mode, bed #2 in Purify mode. RS air conditioner SKV-1 is On, SKV-2
is Off (repair not completed; to be tested ASAP -- see above note).


SM Working Compartment: Pressure (mmHg) -- 742; temperature (deg C) --
25.5; ppO2 (mmHg) -- 159.4; ppCO2 (mmHg) -- 3.7;
SM Transfer Compartment: Pressure (mmHg) -- 751; temperature (deg C) --
19.8.
FGB Cabin: Pressure (mmHg) -- 756; temperature (deg C) -- 22.7.
Node: Pressure (mmHg) -- 752.79; temperature (deg C) -- 22.3 (shell); ppO2
(mmHg) -- n/a; ppCO2 (mmHg) -- n/a.
U.S. Lab: Pressure (mmHg) -- 754.92; temperature (deg C) -- 24.8; ppO2
(mmHg) -- n/a; ppCO2 (mmHg) -- n/a.
Joint Airlock (Equip. Lock): Pressure (mmHg) -- 755.02; temperature (deg
C) -- 22.4; shell heater temp (deg C) -- 22.9, ppO2 (mmHg) -- n/a; ppCO2
(mmHg) -- n/a.


(n/a = data not available)


PMA-1: Shell heater temp (deg C) -- 22.3
PMA-2: Shell heater temp (deg C) -- 19.9

Electrical Power Systems (EPS):

Both P6 channels fully operational. BGA (beta gimbal assembly) 2B and 4B
both in directed position (Blind mode, non solar-tracking, drag
reduction-biased).
SM batteries: Battery #8 is off-line; all other batteries (7) are in
"Partial Charge" mode.
FGB batteries: Battery #6 is off-line (capacity restoration mode, ROM);
battery #5 is in "Cycle" mode; all other batteries (4) are in "Partial
Charge" mode.
Plasma Contactor Unit PCU-1 is in Standby mode; PCU-2 is in Standby mode.

Command & Data Handling Systems: C

&C-1 MDM is prime, C&C-2 is back-up, and C&C-3 is in standby.
GNC-1 MDM is prime; GNC-2 is Backup.
INT-2 is operating; INT-1 is Off.
EXT-1 is On (primary), EXT-2 is Off.
LA-1, LA-2 and LA-3 MDMs are all operating.
PL-1 MDM is Off; PL-2 MDM is Operational.
APS-1 (automated payload switch #1) and APS-2 are both On.
SM Terminal Computer (TVM): 2 redundant lanes (of 3) operational (string 1
dropped out 11/22/03).
SM Central Computer (TsVM): 2 redundant lanes (of 3) operational (string #3
dropped out 10/22/03).
FGB MDM-1 is Off (failed); MDM-2 is Operational.

Propulsion System:

Total propellant load available: 3926 kg (8655 lb) as of 3/26/04; [SM(755)
+ FGB(2512) + Progress M-1(659)]. (Capability: SM -- 860 kg; FGB -- 6120
kg).

Attitude Control Systems:

3 CMGs on-line (CMG-1 failed).
State vector source -- U.S. SIGI-1 (GPS)
Attitude source -- U.S. SIGI-1 (GPS)
Angular rate source -- RGA-1

Flight Attitude:

XPOP (x-axis perpendicular to orbit plane = "sun-fixed" [yaw: 0.5 deg,
pitch: -9.0 deg., roll: 0 deg]), with CMG TA (thruster assist), until 3/28.

Communications & Tracking Systems:

FGB MDM-1 is powered Off; FGB MDM-2 is operational.
All other Russian communications & tracking systems are nominal.
S-band is operating nominally (on string 2).
Ku-band is operating nominally.
Audio subsystem is operating nominally (IAC-1 is prime, IAC-2 is off).
Video subsystem operating nominally.
HCOR (high-rate communications outage recorder) is operating nominally.

Robotics:

SSRMS/Canadarm2 based at Lab PDGF/LEE A, operational on redundant string,
off on prime.
MBS: KA (keep alive) power on both strings.
MT: latched and mated at WS4.
POA: KA power on both strings.
RWS (robotics workstations): Lab RWS is On (DCP connected); Cupola RWS is
Off.

ISS Orbit (as of this morning, 7:00am EST [= epoch]):

Mean altitude -- 365.6 km
Apogee -- 372.8km
Perigee -- 358.3 km
Period -- 91.86 min.
Inclination (to Equator) -- 51.63 deg
Eccentricity -- 0.0010715
Orbits per 24-hr. day -- 15.68
Mean altitude loss last 24 hours -- 155 m
Revolutions since FGB/Zarya launch (Nov. '98) -- 30628

For more on ISS orbit and worldwide ISS naked-eye visibility dates/times,
see

http://www.hq.nasa.gov/osf/station/viewing/issvis.html



--
---------------------------

Jacques :-)

www.spacepatches.info




 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
ISS Status Report No. 17 - 2004 Jacques van Oene Space Station 0 April 4th 04 10:11 AM
ISS Status Report No. 10 - 2004 Jacques van Oene Space Station 1 February 24th 04 02:31 AM
ISS Status Report No. 06 - 2004 Jacques van Oene Space Station 0 January 29th 04 05:50 PM
ISS Status Report No. 01 - 2004 Jacques van Oene Space Station 0 January 4th 04 02:43 PM
Ed Lu Letter from Space #6 Jacques van Oene Space Station 0 July 4th 03 11:10 AM


All times are GMT +1. The time now is 07:44 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 SpaceBanter.com.
The comments are property of their posters.