"Kim Keller" wrote in message . com...
"Jake McGuire" wrote in message
om...
I assume that he's using "Big O" notation for the difficulty of a
task. It's a computer science term, and is generally used to
determine which algorithm is better on abitrarily large data sets.
It's not particularly useful for aerospace work since by definition it
completely ignores non-recurring costs.

I would assume he meant to say "roughly three weeks"


But I don't understand what effort he's referring to when he talks about
three weeks to recycle the shuttle. Recycle it after what? I could probably
give a semi-intelligent answer if he would elaborate.


I'm trying to ask a probably much too complex question; so a
semintelligent answer is probably too much to hope for ;-)

What I'm trying to understand or get a feeling for is why the Space
Shuttle takes whatever it takes (the three weeks I mentioned is
probably incorrect) to turnaround after a launch to prepare it to
launch again. I'm just trying to understand it, from the point of view
of looking at ways it could be improved upon in future launch
vehicles.

For example, some of the tiles need replacement, and I imagine it
takes atleast a week elapsed repairing that. Mating SRBs and main
tanks seem to take a week elapsed or so in total. I bet there are
repairs on the main engines etc. (SSMEs get removed and reinserted I
believe, don't know how long that takes), that kind of thing. Are
there any other long timescale items?

Any help or pointers to information about timescales would be much
appreciated.

-Kim-

  #2  
Old July 19th 03, 11:50 PM
Kim Keller
external usenet poster
 
Posts: n/a
Default Ariane Economies of Scale

"Ian Woollard" wrote in message
om...
What I'm trying to understand or get a feeling for is why the Space
Shuttle takes whatever it takes (the three weeks I mentioned is
probably incorrect) to turnaround after a launch to prepare it to
launch again. I'm just trying to understand it, from the point of view
of looking at ways it could be improved upon in future launch
vehicles.


A typical orbiter flow is broken down into three segments. The first is its
stay in an Orbiter Processing Facility. The average stay is 80 days, and
during that period it is given a thorough inspection, the payload bay is
unloaded and reconfigured for the next flight, systems are tested to verify
their functionality, repairs are made as required, life-cycle-limited items
are replaced as required, small modifications may be performed as time
allows, and some fluids are added for the next flight (ammonia, deionized
water, freon, etc.).

The next segment takes place in the VAB and involves integrating the orbiter
into the complete shuttle "stack". This takes between 5 and 7 days. The
orbiter is mechanically and electrically attached to the ET/SRB stack, and
the interfaces are tested.

The final segment takes place at the pad and runs about 25 days. Hypergolics
are added to the orbital propulsion systems, hydraulics are tested, the main
propulsion system is leak-tested, payload is loaded into the payload bay (if
it wasn't already loaded in the OPF), work on open items from the OPF flow
continues, and final closeout inspections are performed.

For example, some of the tiles need replacement, and I imagine it
takes atleast a week elapsed repairing that. Mating SRBs and main
tanks seem to take a week elapsed or so in total. I bet there are
repairs on the main engines etc. (SSMEs get removed and reinserted I
believe, don't know how long that takes), that kind of thing. Are
there any other long timescale items?


Tile repair is worked in parallel with all other processing work. SRBs take
about a week per booster to stack, but require more work beyond that - say,
a month. The ET doesn't require much work once it arrives at KSC; a small
day-shift team takes care of that. The SSMEs are pulled from the orbiter
after landing and taken to the engine shop for inspection and maintenance. A
fresh set is installed in the orbiter near the end of its stay in the OPF.

The Columbia accident will probably lead to a longer stay in the OPF to
accommodate more extensive inspections. United Space Alliance had plans in
place to gradually reduce the length of an OPF flow to just 30 days by
around 2010, but the mission schedule simply isn't going to require that
kind of effort.

What else can I tell you?

-Kim-


  #3  
Old July 21st 03, 01:43 AM
Kim Keller
external usenet poster
 
Posts: n/a
Default Ariane Economies of Scale

"Ian Woollard" wrote in message
om...
What I'm trying to understand or get a feeling for is why the Space
Shuttle takes whatever it takes (the three weeks I mentioned is
probably incorrect) to turnaround after a launch to prepare it to
launch again. I'm just trying to understand it, from the point of view
of looking at ways it could be improved upon in future launch
vehicles.


A typical orbiter flow is broken down into three segments. The first is its
stay in an Orbiter Processing Facility. The average stay is 80 days, and
during that period it is given a thorough inspection, the payload bay is
unloaded and reconfigured for the next flight, systems are tested to verify
their functionality, repairs are made as required, life-cycle-limited items
are replaced as required, small modifications may be performed as time
allows, and some fluids are added for the next flight (ammonia, deionized
water, freon, etc.).

The next segment takes place in the VAB and involves integrating the orbiter
into the complete shuttle "stack". This takes between 5 and 7 days. The
orbiter is mechanically and electrically attached to the ET/SRB stack, and
the interfaces are tested.

The final segment takes place at the pad and runs about 25 days. Hypergolics
are added to the orbital propulsion systems, hydraulics are tested, the main
propulsion system is leak-tested, payload is loaded into the payload bay (if
it wasn't already loaded in the OPF), work on open items from the OPF flow
continues, and final closeout inspections are performed.

For example, some of the tiles need replacement, and I imagine it
takes atleast a week elapsed repairing that. Mating SRBs and main
tanks seem to take a week elapsed or so in total. I bet there are
repairs on the main engines etc. (SSMEs get removed and reinserted I
believe, don't know how long that takes), that kind of thing. Are
there any other long timescale items?


Tile repair is worked in parallel with all other processing work. SRBs take
about a week per booster to stack, but require more work beyond that - say,
a month. The ET doesn't require much work once it arrives at KSC; a small
day-shift team takes care of that. The SSMEs are pulled from the orbiter
after landing and taken to the engine shop for inspection and maintenance. A
fresh set is installed in the orbiter near the end of its stay in the OPF.

The Columbia accident will probably lead to a longer stay in the OPF to
accommodate more extensive inspections. United Space Alliance had plans in
place to gradually reduce the length of an OPF flow to just 30 days by
around 2010, but the mission schedule simply isn't going to require that
kind of effort.

What else can I tell you?

-Kim-



 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
how well would space ship one scale up? bob haller Space Shuttle 10 June 24th 04 07:29 PM
Ariane 5/Smart-1 succesfully launched Jonathan Archer Space Station 2 September 28th 03 06:12 PM
Ariane Failu Missing Screw Derek Lyons Space Science Misc 1 August 24th 03 06:25 AM
Ariane Economies of Scale Ian Woollard Space Shuttle 2 July 21st 03 01:43 AM


All times are GMT +1. The time now is 11:56 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 SpaceBanter.com.
The comments are property of their posters.