International Space Station Status Report #55

3:30 p.m. CST, Monday, Nov. 7, 2005
Mission Control Center, Houston, Texas

The international space station crew completed the first spacewalk using
U.S. space suits since April 2003, installing a new camera and discarding an
inactive science probe.

Commander Bill McArthur and Flight Engineer Valery Tokarev began their
spacewalk from the Quest Airlock at 9:32 a.m. CST as they placed their suits
on internal battery power. The spacewalk lasted 5 hours and 22 minutes. The
spacewalk started about an hour later than planned. The crew had to
repressurize the Quest airlock to open a misaligned valve in the interior
portion of the two-chambered module. With the valve properly positioned,
they again depressurized the outer chamber to begin their work outside.

Once out the door, McArthur and Tokarev made up the time easily and
completed all of their primary tasks as well as some get-ahead jobs. They
installed a television camera on the outboard end of the port truss segment.
The camera will be an important aid during future assembly work when
additional truss segments are added to the port side of the complex. The
camera installation job had originally been planned to be performed during
the STS-114 space shuttle mission of Discovery in August. It was not
performed during that mission, however, when a job to remove gap fillers
from the shuttle heat shield was added in its place.

McArthur and Tokarev first retrieved the camera's stanchion from an external
tool platform attached to Quest, brought the equipment out to the port
truss, installed the camera on top of the stanchion and installed the
hardware. The camera was powered up and provided its first views from space
just before 12 p.m. Central time.

Next, flight controllers asked the spacewalkers to complete a get-ahead task
by removing a failed electronics box called a Rotary Joint Motor Controller
(RJMC). The RJMC will be returned on the next shuttle mission so engineers
can determine why it failed. The analysis will be used to evaluate future
similar hardware to be shipped to the station

The pair then moved hand over hand to the highest point of the station, the
P6 truss, about 50 feet above the U.S. Destiny Lab. There, McArthur removed
an old experiment called the Floating Potential Probe from its stand and
pushed it away from the station. It floated up and behind the station. It is
expected to burn up in the Earth's atmosphere in about 100 days.

The experiment was installed during a station assembly mission in 2000 to
characterize the electrical environment around the station's solar arrays.
Imagery from STS-114 showed that pieces of the experiment were missing or
backing out of place. Since it was no longer used, managers decided to
remove the unit and discard it.

The crewmembers then received approval to move ahead with the final
get-ahead task before calling it a day. They quickly removed a failed
circuit breaker from the Mobile Transporter (MT) and installed a new one.
Called a Remote Power Control Module, the breaker provides power for
redundant heating on the transporter. The transporter is a type of space
rail car that can moves along the station's truss structure.

With all tasks completed, McArthur and Tokarev entered the airlock and began
repressurizing it at 2:54 p.m. CST. It was the 63rd spacewalk in support of
station assembly and maintenance, the 35th staged from the station and the
18th staged from Quest. It was the third spacewalk for McArthur and the
first for Tokarev.

For information on the crew's activities aboard the station, future launch
dates, and station sighting opportunities from anywhere on the Earth, visit:

http://www.nasa.gov/station

The next ISS status report will be issued Thursday, Nov. 10, or earlier if
events warrant.



--
--------------

Jacques :-)

www.spacepatches.info


 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
International Space Station Expedition 10 Science Operations Status Report for the Week Ending April 29, 2005 Jacques van Oene Space Station 0 May 4th 05 10:06 PM
Space Calendar - March 25, 2005 [email protected] History 0 March 25th 05 03:46 PM
International Space Station Status Report, 11-02-2005 Jacques van Oene Space Station 0 February 12th 05 12:03 AM
International Space Station Status Report #66 - 2004 Jacques van Oene Space Station 0 December 10th 04 10:23 PM
International Space Station Status Report #29 - 2004 Jacques van Oene Space Station 0 June 5th 04 09:44 AM


All times are GMT +1. The time now is 10:27 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 SpaceBanter.com.
The comments are property of their posters.