A Space & astronomy forum. SpaceBanter.com

Go Back   Home » SpaceBanter.com forum » Space Science » News
Site Map Home Authors List Search Today's Posts Mark Forums Read Web Partners

GSLV-F01 Launch Successful - Places EDUSAT in Orbit



 
 
Thread Tools Display Modes
  #1  
Old September 21st 04, 04:28 PM
Jacques van Oene
external usenet poster
 
Posts: n/a
Default GSLV-F01 Launch Successful - Places EDUSAT in Orbit


GSLV-F01 Launch Successful - Places EDUSAT in Orbit
September 20, 2004


Today (September 20, 2004), India's Geosynchronous Satellite Launch
Vehicle, GSLV successfully launched EDUSAT the country's first thematic
satellite dedicated exclusively for educational services, into a
Geosynchronous Transfer Orbit (GTO) from Satish Dhawan Space Centre SHAR
(SDSC SHAR), Sriharikota. This is the first operational flight of GSLV
(GSLV-F01) and the third in the GSLV series. EDUSAT is now orbiting the
Earth in GTO with a perigee (nearest point to Earth) of 180 km and an apogee
(farthest point to Earth) of 35,985 km with an orbital inclination of 19.2
deg with respect to the equator. The orbital period now is 10.5 hours.

The 414 tonne, 49 m tall GSLV, carrying the 1950 kg EDUSAT, lifted off from
Sriharikota at 4:01 pm. About seventeen minutes after lift off, EDUSAT was
successfully placed in GTO. At 4.8 seconds before the countdown reached
zero, the four liquid propellant strap-on stages, each carrying 40 tonne of
hypergolic liquid propellants (UH25 and N2O4), were ignited. At count zero
and after confirming the normal performance of all the four strap-on motors,
the mammoth 138 tonne solid propellant first stage core motor was ignited
and GSLV blazed into the sky. The major phases of the flight included the
first stage burn-out at 104 seconds, the strap on burn-out at 150 seconds,
ignition of the second stage at 150 seconds, heat shield separation at an
altitude of 115 km and 227 seconds into the flight, second stage burn-out at
288 seconds, ignition of the 12.5 tonne cryogenic stage at 304 seconds and
its shut down at 999 seconds after attaining the required velocity of 10.2
km per second.

EDUSAT was put into orbit at 1014 seconds about 5000 km away from
Sriharikota. The separated cryogenic stage was subsequently reoriented and
passivated.

Solar Array Deployment

Soon after its injection into to GTO, the two solar arrays of EDUSAT were
automatically deployed. The deployment of the arrays as well as the general
health of the satellite were monitored by the ground station of the ISRO
Telemetry, Tracking and Command network (ISTRAC) located in the Indonesian
island of Biak. The Master Control Facility (MCF) at Hassan in Karnataka has
since taken control of EDUSAT for all its post launch operations. Ground
stations at Lake Cowichan (Canada), Fucino (Italy) and Beijing (China) are
supporting MCF in monitoring the health of the satellite and its orbit
raising operations.

In the coming days, EDUSAT's orbit will be raised from its present
elliptical GTO to the final Geostationary Orbit (GSO) by firing the
satellite's Liquid Apogee Motor (LAM) in stages. The satellite will be
commissioned into service after the completion of orbit raising operations,
checking out all its transponders and positioning it in its designated
orbital slot of 74 degree East longitude in the GSO. There, it will be
co-located with KALPANA-1 and INSAT-3C.

EDUSAT carries five Ku-band transponders providing spot beams, one Ku-band
transponder providing a national beam and six External C-band transponders
with national coverage beams. It will join the INSAT system that has already
got more than 130 transponders in C-band, Extended C-band and Ku-band
providing a variety of telecommunication and television broadcasting
services.

GSLV was declared operational after its successful developmental test
flights conducted in April 2001 and May 2003. The vehicle was designed and
developed by Vikram Sarabhai Space Centre, Thiruvananthapuram. The inertial
systems for the vehicle were developed by the ISRO Inertial Systems Unit at
Thiruvananthapuram. The Liquid Propulsion Systems Centre (LPSC) also at
Thiruvananthapuram developed the Liquid propulsion stages for the Strap-ons
and the second stage of GSLV as well as the reaction control systems. While
the Russian supplied cryogenic stage is used for third stage propulsion, the
guidance and control of the stage has been implemented by ISRO. Satish
Dhawan Space Centre SHAR is the launch centre for all the launch vehicles of
ISRO. ISTRAC provides Telemetry, Tracking and Command support.

EDUSAT was developed by ISRO Satellite Centre, Bangalore. The payloads were
developed by Space Applications Centre, Ahmedabad. Master Control Facility
at Hassan is responsible for all post launch operations of the satellite.

The successful launch of EDUSAT by the first operational flight of GSLV
further demonstrates its reliability and the end-to-end capability of the
country to establish space systems to undertake large-scale application
programmes for the benefit of the society.



--
---------------------------

Jacques :-)

www.spacepatches.info



 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Space Calendar - August 27, 2004 Ron Astronomy Misc 14 August 30th 04 11:09 PM
PDF (Planetary Distance Formula) explains DW 2004 / Quaoar and Kuiper Belt hermesnines Astronomy Misc 10 February 27th 04 02:14 AM
Unofficial Space Shuttle Launch Guide Steven S. Pietrobon Space Shuttle 0 September 12th 03 01:37 AM
Space Calendar - August 28, 2003 Ron Baalke Misc 0 August 28th 03 05:32 PM
Space Calendar - July 24, 2003 Ron Baalke Misc 0 July 24th 03 11:26 PM


All times are GMT +1. The time now is 10:00 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 SpaceBanter.com.
The comments are property of their posters.