Why Kibo logistics before main lab ?



 
 
Thread Tools Display Modes
  #1  
Old March 11th 08, 10:34 AM posted to sci.space.station
John Doe
external usenet poster
 
Posts: 1,134
Default Why Kibo logistics before main lab ?

They are now shipping the smaller Kibo logistocs module with a few racks
in it. It will be temporarily berthed to node2. Next flight brings up
the real Kibo module that is also to be attached to Node2, and then the
Kibo logistics will be moved to the real Kibo module.

What would have been the drawback of shipping the unpopulated large Kibo
module first, berth it to node2, then in the next flight, ship the
logistics module and bert it right away to Kibo ?

This would save the double handling of the logistics module, as well as
the temporary use/outfitting of the zenith port of node2 and save a few
spacewalks.

I realise that the main kibo lab would not be functional until the
logistics module arrives with the racks, but doesn't it have minimal
heating to keep it alive during the month or two between the two shuttle
flights ?

BTW, the boom sensor will stay with the station. Endeavour isn't
bringing it back to earth. Next shuttle with the large Kibo lab won't be
able to carry the boom sensor. So the next shuttle, after delivering the
large kibo, will then pickup the boom from station and do its inspection
at the station.
  #2  
Old March 11th 08, 11:53 AM posted to sci.space.station
Alan Erskine[_2_]
external usenet poster
 
Posts: 1,316
Default Why Kibo logistics before main lab ?

"John Doe" wrote in message
...

What would have been the drawback of shipping the unpopulated large Kibo
module first, berth it to node2, then in the next flight, ship the
logistics module and bert it right away to Kibo ?

This would save the double handling of the logistics module, as well as
the temporary use/outfitting of the zenith port of node2 and save a few
spacewalks.


Maybe they're going to use the experiments in the meantime? Does seem a
bit... odd.


  #3  
Old March 11th 08, 12:34 PM posted to sci.space.station
[email protected][_2_]
external usenet poster
 
Posts: 10
Default Why Kibo logistics before main lab ?

this way they could bring up the dextre stuff, there was enough
storage room left in the shuttle. maybe that was the reason?

will that be needed for some immediate use, maybe installing the next
two parts of the laboratory?
  #4  
Old March 11th 08, 03:20 PM posted to sci.space.station
Jorge R. Frank
external usenet poster
 
Posts: 2,089
Default Why Kibo logistics before main lab ?

Alan Erskine wrote:
"John Doe" wrote in message
...
What would have been the drawback of shipping the unpopulated large Kibo
module first, berth it to node2, then in the next flight, ship the
logistics module and bert it right away to Kibo ?

This would save the double handling of the logistics module, as well as
the temporary use/outfitting of the zenith port of node2 and save a few
spacewalks.


Maybe they're going to use the experiments in the meantime? Does seem a
bit... odd.


You can't activate the JEM until you install its system racks, and the
JEM is too heavy to be launched with its system racks - they're in the
logistics module. By launching the logistics module first, you gain the
ability to activate the JEM on the same flight that launches it.
 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Raffaello Multi-Purpose Logistics Module steve Space Shuttle 7 June 15th 11 08:08 AM
STS-123 CREW TRAINING / Jaxa Kibo Briefing / Countdown StatusBriefing John[_1_] Space Shuttle 0 March 8th 08 08:40 PM
Why launching JEM ahead of Kibo Albert Blauensteiner Space Shuttle 1 November 13th 07 06:50 PM
Alternatives to Shuttle Logistics missions Blurrt Space Shuttle 10 November 28th 05 02:30 PM
Raffaello Logistics Module Sealed For Space Shuttle Flight Jacques van Oene News 0 April 15th 05 05:59 PM


All times are GMT +1. The time now is 10:55 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 SpaceBanter.com.
The comments are property of their posters.