ISS On-Orbit Status 29 Jun 2004

All ISS systems continue to function nominally except those noted previously
or below.

The current sleep/wake cycle delayed crew wakeup time today by four hours,
to 6:00am EDT, with bedtime tonight at 11:00pm. Tomorrow, wakeup is set for
9:00am and sleep for 5:00am the next day. By Friday, the schedule will have
returned to the usual pattern.

All systems are reported ready for tomorrow's Orlan EVA (hatch open: 5:40pm
EDT).

In a repeat of last week's spacewalk preparations, CDR Padalka and FE/SO
Fincke restored their Orlan-M suits to readiness by filling the DIDBs
(disposable in-suit drink bags) and installing them in the suits. Mike
Fincke's "skaphandr" received a fresh BK-3 oxygen bottle, and both suits
were equipped with new LiOH (lithium hydroxide) cartridges for filtering
carbon dioxide.

Padalka also equipped both Orlans with "Pille-MKS" radiation sensors, which
he obtained from their regular exposure locations in the RS after recording
their dose measurements. A third sensor, for background readings, was
placed in the SM cabin. ["Pille" has ten sensors normally situated at
various locations in the RS (port cabin window, stbd cabin window, ASU
toilet facility, control panel, etc.). Dosage values are called down or
downlinked via Regul Paket/Email or OCA.]

In preparation for the EVA, which requires the station reconfigured to
"unmanned mode", Gennady powered down the new "Sputnik-SM" ham radio system
in the SM.

FE Fincke got the Ku-band TV system ready for covering the EVA by
reconnecting the UOP (utility outlet panel) bypass power cable to the RWS
DCP (robotics workstation display & control panel), followed by configuring
the Sony PD100 camcorders in the Node and Lab for situational (internal)
monitoring during the EVA.

Since hatches will be closed between the Russian and U.S. segments (and also
between the SM and the DC1), later tonight Mike will reset the OpsLAN
onboard laptop network accordingly.

At ~2:00pm, the crew will conduct another review of the final spacewalk
timeline, which included new times for the RSA ground pass "Outpost"
sessions and new day/night times. There also is another tagup scheduled at
4:00pm with EVA specialists at TsUP/Moscow to discuss tomorrow's venture via
S-band S/G (space-to-ground). [As originally planned for last week, after
egressing the DC1 at ~5:46pm EDT, the first 30-35 minutes will be spent on
preparing the GStM-1 "Strela" cargo boom, mounted on the DC1 hull, and
extending it (by manually cranking its pitch and yaw drive handles) towards
the FGB, where its end effector (TU) will be attached at a handrail (#1076).
The crane, measuring 3 m retracted and 15 m in fully extended configuration,
then serves as handrail and attachment for the crew's safety tethers until
U.S. tethers are secured at the PMA-1 (Pressurized Mating Adapter 1) and
later on the S0 truss. Removal and replacement (R&R) of the failed RPCM, to
start at or about 8:29pm, requires prior opening of the door of the portside
power assembly SPDA (secondary power distribution assembly). After the R&R
and restoration of external configurations, including retraction and
securing of the GStM-1, ingress of the last spacewalker, Padalka (EV1), is
expected at ~11:33pm. The two Mission Control Centers will take turn in
leading the spacewalk, with TsUP in charge of Russian segment (RS)
operations and egress, translation, return, ingress and any Russian task
activities, while MCC-Houston has the lead for detailed ops dealing with the
U.S. segment, the RPCM R&R and the power-down of the external Lab DDCU
(dc-to-dc converter unit) 2A power source of the RPCM prior to the R&R, and
its subsequent power-up.]

Shortly before sleep time tonight, the CDR will once more break out the
"Urolux" equipment, setting it up for the Russian biochemical urine test
(PZE MO-9), a standard requirement before and after Orlan-suited activities.
[The MO-9 analysis uses the sophisticated in-vitro diagnostic apparatus
"Urolux" developed originally for the Mir program.]

Earlier today, Mike Fincke collected and stowed the two FMK (formaldehyde
monitoring kit) sampling badges deployed previously (6/11) in the Lab and SM
to catch any atmospheric formaldehyde on a sampling substrate for later
analysis in JSC lab facilities.

Gennady is scheduled to conduct the daily routine maintenance on the SOZh
life support system, comprising the water supply equipment, food supply
subsystem (SOP), and sanitary hygiene equipment (SGO).

Both crewmembers will perform their daily 2.5-hr. physical exercise program
on TVIS, RED exerciser, and VELO cycle with load trainer.

In a change from last week's plan, during the EVA MCC-Houston will conduct a
spin-up test of CMG-2 (control moment gyroscope 2), right after installation
and activation of the spare RPCM replacing the failed RPCM S02B-D. The
rotor spin-up is planned for 60 seconds duration.

After the CMG-2 spin-up test, about one hour before the end of the
spacewalk, there will also be an attitude control handover test from the
Russian segment (RS) to the U.S. segment (USOS) to characterize a
disturbance torque observed on the RS during last week's EVA.

Following the completion of the RPCM R&R, MCC-H will conduct a gimbal bias
evaluation on CMG-2, preparatory to introducing the gyro back into the
steering law on Friday morning (about 30 hrs after the EVA). To support the
gimbal bias evaluation as well as a Russian GPS (Global Positioning System)
test, the ISS will remain in LVLH XVV attitude through 7/2.

U.S. and Russian specialists have worked out a joint plan for post-EVA
repressurization of the ISS interior. [After the EVA, during which cabin
pressure is expected to be at ~720 Torr (mmHg), the cabin will first be
repressurized with the air remaining in Progress 14P storage, raising total
pressure to 730-735 Torr, with a ppO2 (oxygen partial pressure) of ~23%. To
relieve subsequent oxygen production requirements on the Elektron, an
additional 19-20 Torr increase from the U.S. N2 HPTs (nitrogen high-pressure
tanks) outside the Airlock will then follow.]

Another set of options for Mike's Saturday Science program this weekend
(7/3) was uplinked for his choice. They are a BCAT-3 (Binary Colloid Alloy
Test 3) photo session, test sequences for the CFE (Capillary Flow
Experiment), or an EPO (Educational Program Operation) demo of pollution
research.

The planned Russian SM 7.02 software update is now scheduled for 7/15-16.
The upload will require inhibiting thrusters for a total of about 15 min.
[The new software includes improvements for ATV (automated transfer vehicle)
integration, payload control, and other general upgrades (like software
efficiency, operational upgrades, accommodation of interface changes,
etc.).]

During the last five days, MCC-H specialists have conducted a plasma
characterization test of the ISS external environment using the PCU-2
(Plasma Contactor Unit #2) in Discharge mode (PCU-1 in Standby), which ended
today. [PCU xenon-emission current is the sum of the electron currents
collected from the ambient ionosphere by (1) the high-voltage (160V) P6
solar arrays (when in ram position) and (2) via low-voltage induction by the
ISS structure moving through the ionosphere. The PCUs prevent the build-up
of potentially hazardous floating point (FP) voltages on conducting ISS
structure by emitting the collected electrons back to the ionospheric
plasma. The Russian segment (RS) has been specifically designed to inhibit
charge collection. The current test will help understand the physics of ISS
charging and the ability of the RS to inhibit it. In particular, the data
will assist in determining the impact to ISS charging of adding additional
SAWs (solar array wings).]

Today's CEO (Crew Earth Observations) photo targets, in the current LVLH
attitude no longer limited by flight rule constraints on the use of the Lab
nadir/science window, except for the shutter closure and
condensation-prevention plan (limited to 90 min. in 24 hours), were Chicago,
Illinois (it looked like the weather was clearing with a strong cold front
passing. The crew had a nadir pass over the "Windy City" as ISS approached
from NW), Western Equatorial Atlantic (as ISS approached the coast of South
America from the NW, the Amazon delta and estuaries were right of track.
Looking left of track for sun glint and internal waves as the Amazon
discharge interacts with the open Atlantic. If possible, the crew was to try
to include some landmarks in their camera field of view), and Typhoon
Tingting (DYNAMIC EVENT: One of two large typhoon systems active in the
western Pacific now, Tingting is the only one the crew was likely to see
today. Looking well right of track, possibly a pan for this Category 3
tropical cyclone).

CEO images can be viewed at the websites.


http://eol.jsc.nasa.gov
http://earthobservatory.nasa.gov

See also the website "Space Station Challenge" at


http://voyager.cet.edu/iss/

U.S. & Russian Segment Status (as of today, 1:00pm EDT)

Environmental Control and Life Support (ECLSS) and Thermal Control (TCS):

Elektron O2 generator is On. Vozdukh CO2 scrubber is On. U.S. CDRA CO2
scrubber is Off. TCCS (trace contaminant control subsystem) is operating.
SM Gas Analyzer has been calibrated and is used for ppO2 & ppCO2 monitoring.
MCA (major constituents analyzer) is in Life Extending Mode (LEM). BMP
Harmful Impurities unit: absorbent bed #1 in Purify mode, bed #2 in Purify
mode. RS air conditioner SKV-1 is On, SKV-2 is Off (SM panel mods completed
4/8; SKV-2 activation failed 4/20; is now functioning again). SFOG slot #2
fan suspect (not usable).


SM Working Compartment: Pressure (mmHg) -- 742; temperature (deg C) --
25.6; ppO2 (mmHg) -- 150.5; ppCO2 (mmHg) -- 4.7.
SM Transfer Compartment: Pressure (mmHg) -- 741; temperature (deg C) --
20.2.
FGB Cabin: Pressure (mmHg) -- 755; temperature (deg C) -- 20.3.
Node: Pressure (mmHg) -- 740.60; temperature (deg C) -- 23.1 (shell); ppO2
(mmHg) -- n/a; ppCO2 (mmHg) -- n/a.
U.S. Lab: Pressure (mmHg) -- 751.50; temperature (deg C) -- 24.7; ppO2
(mmHg) -- n/a; ppCO2 (mmHg) -- n/a.
Joint Airlock (Equip. Lock): Pressure (mmHg) -- 751.50; temperature (deg
C) -- 22.6; shell heater temp (deg C) -- n/a, ppO2 (mmHg) -- n/a; ppCO2
(mmHg) -- n/a.


(n/a = data not available)


PMA-1: Shell heater temp (deg C) -- n/a
PMA-2: Shell heater temp (deg C) -- n/a.

Electrical Power Systems (EPS):

Both P6 channels fully operational. BGA (beta gimbal assembly) 2B and 4B
both in directed position (Dual angle/"blind" mode, non solar-tracking,
biased for drag reduction).
SM batteries: All batteries (8) are on line in "Partial Charge" mode.
FGB batteries: Battery #5 is off line; all other batteries (5) are on line
in "Partial Charge" mode.


Plasma Contactor Unit PCU-1 is in Standby mode; PCU-2 is in Standby mode.

Command & Data Handling Systems:

C&C-1 MDM is prime, C&C-2 is backup, and C&C-3 is in standby.
GNC-2 MDM is prime; GNC-1 is backup.
INT-2 is operating; INT-1 is Off.
EXT-1 is On (primary), EXT-2 is Off (backup).
LA-1, LA-2 and LA-3 MDMs are all operating.
PL-1 MDM is Off; PL-2 MDM is Operational.
APS-1 (automated payload switch #1) and APS-2 are both On.
SM Terminal Computer (TVM): 2 redundant lanes (of 3) operational (string 1
dropped out 11/22/03).
SM Central Computer (TsVM): 2 redundant lanes (of 3) operational (string #3
dropped out 10/22/03).
FGB MDM-1 is Off (failed, 11/21/03); MDM-2 is Operational.

Propulsion System:

Total propellant load available: 3963 kg (8737 lb) as of 6/24/04; [SM(552)
+ FGB(2772) + Progress M(639)]. (Capabilities: SM -- 860 kg; FGB -- 6120
kg).

Attitude Control Systems:

2 CMGs on-line (CMG-1 failed, since 6/6/02; CMG-2's RPC-17 failed 4/21/04).
State vector source -- U.S. SIGI-1 (GPS)
Attitude source -- U.S. SIGI-1 (GPS)
Angular rate source -- RGA-1

Flight Attitude:

LVLH XVV (local vertical/local horizontal = "earth-fixed": z-axis in local
vertical, x-axis in velocity vector [yaw: -10 deg, pitch: -9 deg, roll: 0
deg]), with CMG/TA (thruster assist) Momentum Management, until 6/28,
following the EVA.

Communications & Tracking Systems:

FGB MDM-1 is powered Off; FGB MDM-2 is operational.
All other Russian communications & tracking systems are nominal.
S-band is operating nominally (on string 2).
Ku-band is operating nominally (may require a mask).
Audio subsystem is operating nominally (IAC-1 is prime, IAC-2 is off).
Video subsystem operating nominally.
HCOR (high-rate communications outage recorder) is operating nominally.

Robotics:

SSRMS/Canadarm2 based at Lab PDGF/LEE A, operational on redundant string,
off on prime.
MBS: KA (keep alive) power on both strings.
MT: latched and mated at WS4.
POA: KA power on both strings.
RWS (robotics workstations): Lab RWS is On (DCP connected); Cupola RWS is
Off.

ISS Orbit (as of this morning, 8:18am EDT [= epoch]):

Mean altitude -- 360.5 km
Apogee -- 364.2 km
Perigee -- 356.8 km
Period -- 91.7 min.
Inclination (to Equator) -- 51.6319 deg
Eccentricity -- 0.0005451
Solar Beta Angle -- 25.0 deg
Orbits per 24-hr. day -- 15.69
Mean altitude loss in last 24 hours -- 80 m
Revolutions since FGB/Zarya launch (Nov. '98) -- 32025


For more on ISS orbit and worldwide ISS naked-eye visibility dates/times,
see http://www.hq.nasa.gov/osf/station/viewing/issvis.html



--
---------------------------

Jacques :-)

www.spacepatches.info



 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
International Space Station Status Report #29 - 2004 Jacques van Oene Space Station 0 June 5th 04 09:44 AM
International Space Station Status Report #04-27 - 2004 Jacques van Oene Space Station 0 May 25th 04 02:33 PM
ISS Status Report No. 06 - 2004 Jacques van Oene Space Station 0 January 29th 04 05:50 PM
ISS Status Report No. 01 - 2004 Jacques van Oene Space Station 0 January 4th 04 02:43 PM
Ed Lu Letter from Space #6 Jacques van Oene Space Station 0 July 4th 03 11:10 AM


All times are GMT +1. The time now is 02:37 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 SpaceBanter.com.
The comments are property of their posters.