|
|
Thread Tools | Display Modes |
#21
|
|||
|
|||
Current status of shuttle programme ?
John Doe wrote:
Am I the only one with a feeling that the arrays won't be launched by the shuttle and P6 will stay on Z1 for a very long time ? I'm sure Bob Haller would want it that way. There's a chance that the shuttle program will be canned prematurely, but I suspect that they'll let it run its course, giving NASA enough flights to complete the station and service/deorbit HST. Is there truly a consensus that the shuttle will complete assembly of the truss ? What else can? Even if there is an alternative, the habitable modules do need the shuttle, and they can't be launched until the truss is done. Should the shuttle be grounded midways in those flights, it runs the chance of leaving the station in an asymetrical configuation. They won't ground the shuttle between the launch of S3/4 and P3/4 without very good reason. There are contingencies, of course. Will NASA modify installation schedules to ensure that whenever the shuttle brings an asymetrical segment, that segment will not be fully installed, making it possible for crews to EVA and remove it should the shuttle be grounded for a long time (or permanently) to put the station back in a symetrical config ? It's possible. As I recall, installing the truss segments is a very EVA-heavy task. Your proposal would require offloading a lot of EVAs from the shuttle to the station crew, to be performed while the shuttle is not present. Significant extra training would be required for the ISS crew for this job. Additionally, with a crew of only two, the SSRMS would not be available during the EVA, which would require a rethink of the EVA procedures. Asymmetry is only a real problem for the P3/4-S3/4 stage. Outer segments are less important. Earlier ISS schedules had long gaps between the P6 relocation (shortly after the arrival of P5) and the arrival of S6 (very late in the assembly sequence). --Chris |
#22
|
|||
|
|||
Current status of shuttle programme ?
On Tue, 15 Nov 2005 08:52:05 -0500, John Doe wrote:
Am I the only one with a feeling that the arrays won't be launched by the shuttle and P6 will stay on Z1 for a very long time ? Can't answer if you're the only one, but I think worst case is that ISS would end up with two or three, instead of four solar array sets. Is there truly a consensus that the shuttle will complete assembly of the truss ? If you have ten remaining fights, I think the most likely scenario is... 2006: STS-121, ULF-1 (RTF Test Flight 2) STS-115, P3 & P4 2007: STS-120, Node 2 STS-122, Columbus 2008: STS-116, P5 STS-117, S3 & S4 2009: STS-124, Kibo JEM STS-125, Kibo EF 2010: STS-118, S5 STS-119, S6 The outfitting missions for Columbus and Kibo currently scheduled for Shuttle would be offloaded to ATV and HTV. One of the Truss flights might get canned for HST, but I'd doubt it. Should the shuttle be grounded midways in those flights, it runs the chance of leaving the station in an asymetrical configuation. They can live with that, now that NASA can buy Progress flights to keep ISS tanked up. Brian |
#23
|
|||
|
|||
Current status of shuttle programme ?
John Doe wrote in :
Chris Bennetts wrote: I suspect that there'll be a few nervous moments when the P6 arrays are retracted and re-extended during the relocation. As I recall, there were a few hiccups during the initial extension on STS-97. I hope it goes smoothly. Am I the only one with a feeling that the arrays won't be launched by the shuttle and P6 will stay on Z1 for a very long time ? Is there truly a consensus that the shuttle will complete assembly of the truss ? Consensus? Didn't I already say that the current plan is being reviewed by the ISS partners, and that they wanted their elements moved earlier (before the completion of the truss)? "Consensus" depends on how well the partners negotiate here, provided they don't shoot themselves in the foot. -- JRF Reply-to address spam-proofed - to reply by E-mail, check "Organization" (I am not assimilated) and think one step ahead of IBM. |
#24
|
|||
|
|||
Current status of shuttle programme ?
Brian Thorn wrote:
If you have ten remaining fights, I think the most likely scenario is... 2006: STS-121, ULF-1 (RTF Test Flight 2) STS-115, P3 & P4 2007: STS-120, Node 2 STS-122, Columbus 2008: STS-116, P5 STS-117, S3 & S4 [...] I mostly agree, but I'd swap the 2007 and 2008 flights. As well as the symmetry issue, there may be a power issue to consider. When P4/S4's arrays are extended, the P6 array on that side has to be retracted for clearance. I'm not sure that P4 and half of P6 would be enough to power Node 2 and Columbus adequately for even basic utilisation. It'd be safer to get both sides in place before launching Columbus and the Node. --Chris |
#25
|
|||
|
|||
Current status of shuttle programme ?
Chris Bennetts wrote:
I mostly agree, but I'd swap the 2007 and 2008 flights. As well as the symmetry issue, there may be a power issue to consider. I agree. As well, installing the truss requires far more EVA tasks than just berthing a new module and making a few connections on the outside. With a 2 man crew on ISS, presence of shuttle makes EVAs far easier because there is someone to man the arm , choreograph everything etc. So the focus should be on launching the truss modules which really do require most EVA work. And considering that the shuttle could be grounded at any point in time, those tasks shoudl have priority. And with columbus/kibo unlaunched, that gives incentive for NASA to contuinue to fly shuttle to complete its commitment. Lets not forget that NASA also has to power most of the russian segment which will remain the core life support segment, so the arrays are quite important. Launching node2, kibo and columbus first may allow NASa to declare "we delivered on our commitments and can stop operating shuttle", but without the truss, those segments are useless. |
#26
|
|||
|
|||
Current status of shuttle programme ?
"Bob Haller" wrote in message
oups.com... No I am important till the day, hopefully soon when the shuttle is permanetely grounded. I sincerly hope this is BEFORE the shuttle kills again! The shuttle doesn't kill, Bob. |
#27
|
|||
|
|||
Current status of shuttle programme ?
On Wed, 16 Nov 2005 15:27:19 -0600, Mark Lopa wrote
(in article ): "Bob Haller" wrote in message oups.com... No I am important till the day, hopefully soon when the shuttle is permanetely grounded. I sincerly hope this is BEFORE the shuttle kills again! The shuttle doesn't kill, Bob. More importantly, everyone on the planet is serving a life sentence and no one gets out alive. That's a concept Bbo hasn't ever seemed to grasp. -- "Fame may be fleeting but obscurity is forever." ~Anonymous "I believe as little as possible and know as much as I can." ~Todd Stuart Phillips www.angryherb.net |
#28
|
|||
|
|||
Current status of shuttle programme ?
Herb Schaltegger wrote: On Wed, 16 Nov 2005 15:27:19 -0600, Mark Lopa wrote (in article ): No I am important till the day, hopefully soon when the shuttle is permanetely grounded. I sincerly hope this is BEFORE the shuttle kills again! The shuttle doesn't kill, Bob. More importantly, everyone on the planet is serving a life sentence and no one gets out alive. Oh thanks, I feel much better now. That's a concept Bbo hasn't ever seemed to grasp. It gives you a real good perspective on how the greater universe and the cosmos views mankind. http://webpages/charter.net/tsiolkovsky/rocket.htm |
#30
|
|||
|
|||
Current status of shuttle programme ?
On Wed, 16 Nov 2005 16:16:16 +1100, Chris Bennetts
wrote: If you have ten remaining fights, I think the most likely scenario is... 2006: STS-121, ULF-1 (RTF Test Flight 2) STS-115, P3 & P4 2007: STS-120, Node 2 STS-122, Columbus 2008: STS-116, P5 STS-117, S3 & S4 [...] I mostly agree, but I'd swap the 2007 and 2008 flights. As well as the symmetry issue, there may be a power issue to consider. I thought about that, which would essentially be the existing schedule minus the resupply and outfitting flights. But there has been so much talk of juggling the schedule to appease Europe (and to a lesser degree Japan) that I'm willing to bet that the actual two-per-year schedule looks much like I proposed above (with the possibility of a third flight in 2006 before the cuts really kick in.) When P4/S4's arrays are extended, the P6 array on that side has to be retracted for clearance. I'm not sure that P4 and half of P6 would be enough to power Node 2 and Columbus adequately for even basic utilisation. It'd be safer to get both sides in place before launching Columbus and the Node. Another thing to consider is that Columbus will be mostly empty when launched, like Destiny was. It won't need a lot of power. And once its up, ESA can start sending up racks via ATV (perhaps modified for PMA berthing) while waiting for power. So once S3 and S4 arrive, its ready to go. Brian |
Thread Tools | |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT: S05-029 | Jacques van Oene | Space Shuttle | 5 | November 5th 05 11:53 PM |
Space Shuttle Processing Status Report, 01-04-2005 | Jacques van Oene | Space Shuttle | 0 | April 1st 05 11:30 PM |
Unofficial Space Shuttle Launch Guide | Steven S. Pietrobon | Space Shuttle | 1 | March 2nd 05 04:35 PM |
Space Shuttle Processing Status Report, 10-12-2004 | Jacques van Oene | Space Shuttle | 0 | December 10th 04 10:05 PM |
KSC Shuttle Status, 04-03-2004 | Jacques van Oene | Space Shuttle | 0 | March 6th 04 11:47 AM |