|
|
Thread Tools | Display Modes |
#1
|
|||
|
|||
Additional transfers OKed
NASA PAO confirmed that extra day of docked operations.
Final OK for shuttle health to come on Monday. The adidtional transfers will consist mostly of spare parts in the shuttle. For instance, spare ink cartridges for printers, and if I heard correctly, one printer. Also, various power cables ( I assume whatever is compatible between shuttle and station) Oh, one more item mentioned: some washcloths and towels would be moved to station. My guess is that they will essentially cannabalise the shuttle's on-board spare parts inventory and move that to station to help station sustain another long period of no shuttle visits. (I wonder if they have any spare laptops they could leave on station, or if all laptops in shuttle are still required at one point between undocking and landing.) Another aspect: for some kits in MPLM, they will now take the time to extract some items and test them before discarding the part they are meant to replace (for instance, O2 masks). As a result, some procedures have already been changed to extract certain components from bags as before they are stowed somewhere in the station and place them in an obvious spot which will make its testing faster/easier on that extra day. While I think the extra day is nice and probably very welcome from both crews, my gut tells me that the real reason for extension was to give engineers on ground more time to study the shuttle imaging. They've given tiles a good score card, but final decision on whether RCC surfaces are OK isn't yet taken. There is only so many spare parts on the shuttle they can transfer over to the station without affecting the shuttle's operation, and only so many spares that are compatible with station systems. Would they leave the EVA suits and SAFER units on the station ? Is SAFER "field rechargeable" or must it absolutely be refilled with nasty chemicals on the ground ? One more thing mentioned: As the station grows once/id construction is restarted , the CMG redundancy will diminish since more CMGs are required to handle the greater mass. And for periods of asymetric configs during truss assembly, a minimum of 4 working CMGs are required. I suspect NASA will want to do a post mortem on the failed CMG ASAP so it can determine of the 3 others are likely to fail and thus start to plan some cargo capacity for shipping spare CMGs to the station. Once construction of truss commences, failure of a CMG would be quite a big deal. Having a spare one up there already would allow the 2 station occupants to do an EVA and replace it before the next shuttle flight. |
#2
|
|||
|
|||
John Doe wrote: [...] While I think the extra day is nice and probably very welcome from both crews, my gut tells me that the real reason for extension was to give engineers on ground more time to study the shuttle imaging. Perhaps, but a lot of Shuttle missions have been extended extra days. Usage rate of consumables on Discovery was probably just as big a factor. /dps |
Thread Tools | |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
NASA TV migrating to digital format: additional receiver required | Jacques van Oene | Space Shuttle | 3 | June 6th 05 09:12 AM |
Shuttle launch delayed until July | Pat Flannery | History | 120 | May 16th 05 08:29 PM |
New NASA Imagery Sheds Additional Perspectives On Tsunami | [email protected] | Space Shuttle | 0 | January 20th 05 12:57 AM |
Additional egress into space is scheduled on June 25. | Jacques van Oene | Space Station | 1 | June 18th 04 03:59 AM |
Electric Gravity&Instantaneous Light | ralph sansbury | Astronomy Misc | 8 | August 31st 03 02:53 AM |