MSG-2 Launch Diary

13 - 19 November


Sunday 13 November
No work during the Sunday, but this did not mean staying in bed! ESA had
invited the combined MSG-2 team to join for 'go-karting' in Macouria. The
track was reserved from 09:00 until 12:00 and a competition was organised.
This was followed by a buffet. There was also a possibility to go 'Quad
biking'. Despite the fact that the track was bone dry (those in the know
tell you its a lot more fun when the jungle is wet), it was good fun. A few
adventurous souls went flying in Ultra lights, some of them with very mixed
feelings, vowing to never do this again (You said this already in 1991
Leonie)!
All in all, it was a great day for team-building, and we have to say that
the MSG-2 team-spirit is very good.

Monday 14 November
The flight batteries have been installed and torqued definitively (we hope
!) on the spacecraft; the spare battery destorage has started. For the UPS
(Unified Propulsion System), the regulator and thrusters line final
pressurisation have been performed. Flight/Non-flight equipment inspection
has started. The SEVIRI baffle cover (which will be ejected during flight)
finalisation has been performed.
Tuesday 15 November
The flight batteries have been connected, with all functions related to
charge, discharge and monitoring being tested. The TPA (Toroidal Pattern
Antenna) and UHF (Ultra High Frequency) flight coax cable have been
installed.
In parallel the inspection of Building S5-A for the spacecraft filling
operation has been done. This building is specifically designed for safety
precautions needed for the hazardous operation with toxic liquids. MSG-2
will move to this building at the end of the health tests.


Wednesday 16 November
The flight/non-flight inspection has started; this inspection is being
performed without the Solar Arrays Panels installed - the spacecraft being
open and fully accessible - allowing checking to see if all equipment is in
its flight configuration.
The preparation for the filling operation has started with the set-up and
validation of the fuelling equipment in the S5-A building.
In the evening the team watched a perfect launch of V167 from various
locations. The way is now clear for us!
Thursday 17 November
The installation of the eight Solar Arrays Panels (SAP) started. In parallel
the EDA (Electronically Despun Antenna) inspection has been performed and
the MLI (Multi Layer Insulation) thermal protection was finalised.


Friday 18 November
Solar Arrays Panels flood test started. In this test the panels are
illuminated and the resulting current checked, to ensure that all electrical
connections are correct and functioning properly.
Saturday 19 November
The preparation for the antennas connection test has started. This test
checks the Radio Frequency (RF) connection between the spacecraft
transmitters and receivers and the related antennas is correctly performed.
Due to the relatively high RF power that is radiated, special absorber
panels have to be placed around the satellite. After everything was checked
by the safety department, the test started and will continue next week.


--
--------------

Jacques :-)

www.spacepatches.info


 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Space Calendar - March 25, 2005 [email protected] History 0 March 25th 05 03:46 PM
Space Calendar - January 28, 2005 [email protected] Astronomy Misc 1 January 31st 05 09:33 AM
Space Calendar - August 27, 2004 Ron Misc 14 August 30th 04 11:09 PM
Space Calendar - August 27, 2004 OzPirate Policy 0 August 27th 04 10:11 PM
Space Calendar - April 30, 2004 Ron History 0 April 30th 04 03:55 PM


All times are GMT +1. The time now is 06:19 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 SpaceBanter.com.
The comments are property of their posters.