May 23, 2005

Melissa Mathews
Headquarters, Washington
(Phone: 202/358-1272)

Jessica Rye
Kennedy Space Center, Fla.
(Phone: 321/867-2468)

STATUS REPORT: S05-020

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

NASA's Space Shuttle fleet is housed and processed at Kennedy Space
Center (KSC), Fla.

Mission: STS-114 - 17th ISS Flight (LF1) - Multi-Purpose Logistics
Module
Vehicle: Discovery (OV-103)
Location: Launch Pad 39B
Launch Date: Launch Planning Window July 13 - 31, 2005
Launch Pad: 39B
Crew: Collins, Kelly, Noguchi, Robinson, Thomas, Lawrence and Camarda
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Technicians are preparing to roll Space Shuttle Discovery from the
launch pad to the Vehicle Assembly Building, now scheduled for early
morning on Thursday, May 26. Once there, orbiter Discovery will be
demated, or removed, from its External Tank (ET) and lowered into the
transfer aisle. On or about June 7, Discovery will be lifted and
attached to its new ET and Solid Rocket Boosters. Discovery is
expected to be rolled back out to the pad in mid-June.

Engineers are also investigating part of Discovery's main landing gear
door, after a small crack was found last week in a retract link
assembly on the right-hand main landing gear on orbiter Atlantis in
Orbiter Processing Facility bay 1. The Atlantis assembly was removed
and will be replaced with a spare. Engineers have looked at the
closeout photos of the link assembly on Discovery. The initial review
indicates the link assembly does not appear to have any cracks. To
ensure there are no cracks in the assemblies, technicians will enter
Discovery's payload bay and perform borescope inspections of the
area, an inspection that can only be accomplished at the pad. This
additional work does not impact the launch planning window of July
13-31.

Following the inspections, Discovery will undergo hot-fire tests of
its Auxiliary Power Units, currently scheduled for Wednesday.

Previous Space Shuttle processing status reports are available on the
Internet. Visit:

http://www.nasa.gov/returntoflight


-end-

--
--------------

Jacques :-)

www.spacepatches.info


 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Space Shuttle Processing Status Report, 20-05-2005 Jacques van Oene Space Shuttle 0 May 20th 05 07:10 PM
Space Shuttle Processing Status Report, 11-02-2005 Jacques van Oene Space Shuttle 0 February 11th 05 09:04 PM
Space Shuttle Processing Status Report, 01-10-2004 Jacques van Oene Space Shuttle 0 October 1st 04 06:54 PM
National Space Policy: NSDD-42 (issued on July 4th, 1982) Stuf4 Space Shuttle 150 July 28th 04 07:30 AM
KSC Space Shuttle Processing Status Report, 25-06-2004 Jacques van Oene Space Shuttle 0 June 27th 04 01:58 PM


All times are GMT +1. The time now is 03:16 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 SpaceBanter.com.
The comments are property of their posters.