A Space & astronomy forum. SpaceBanter.com

Go Back   Home » SpaceBanter.com forum » Space Science » Space Shuttle
Site Map Home Authors List Search Today's Posts Mark Forums Read Web Partners

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT: S-061206



 
 
Thread Tools Display Modes
  #1  
Old June 16th 06, 03:09 PM posted to sci.space.shuttle
external usenet poster
 
Posts: n/a
Default NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT: S-061206

06.12.06

Tracy Young
Kennedy Space Center, Fla.
(321) 867-2468

STATUS REPORT: S-061206

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

Note: NASA's Kennedy Space Center issues Space Shuttle Processing
Status Reports periodically and is the source for information
regarding processing activities associated with the vehicles and
payloads. This report does not necessarily reflect the chronological
order of future space shuttle missions. If you are a member of the
media and would like further information, visit:
http://www.nasa.gov/centers/kennedy/news/index.html

Mission: STS-121 - 18th International Space Station Flight (ULF1.1) -
Multi-Purpose Logistics Module
Vehicle: Discovery (OV-103)
Location: Launch Pad 39B
Launch Date: Launch Processing Window July 1-19, 2006
Launch Pad: 39B
Crew: Lindsey, Kelly, Sellers, Fossum, Nowak, Wilson and Reiter
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

On Friday, hypergolic fuel was loaded into the hydraulic power units
of the solid rocket boosters. The payload bay doors of the orbiter
are currently closed in anticipation of high wind and rain from
Tropical Storm Alberto. Weather permitting, the doors will be opened
Tuesday for camera checkouts in the shuttle's remote manipulator
system (robotic arm) and the orbiter boom sensor system. Aft closeout
work is also scheduled to begin Tuesday.

The crew is scheduled to fly to KSC today in advance of the Terminal
Countdown Demonstration Test, which is scheduled for Wednesday and
Thursday. This is a launch dress rehearsal that occurs prior to each
shuttle mission.

External Tank

External Tank 118, which will fly as part of the STS-115 mission,
arrived via barge at the KSC turn basin Friday evening. It was
transported to the Vehicle Assembly Building the same day. On
Saturday, the tank was lifted into a checkout cell in high bay No.2,
where it is being processed for flight.


-end-


--
--------------

Jacques :-)

www.spacepatches.nl


 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Early NASA PDFs Rusty History 48 June 13th 06 05:51 AM
Unofficial Space Shuttle Launch Guide Steven S. Pietrobon Space Shuttle 0 March 1st 06 04:31 AM
NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT, 11.10.05 Jacques van Oene Space Shuttle 0 November 11th 05 04:07 AM
JimO writings on shuttle disaster, recovery Jim Oberg Space Shuttle 0 July 11th 05 06:32 PM
NASA's Space Shuttle Processing Status Report, 27-05-2005 Jacques van Oene Space Shuttle 0 May 27th 05 08:49 PM


All times are GMT +1. The time now is 12:33 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 SpaceBanter.com.
The comments are property of their posters.