![]() |
|
|
Thread Tools | Display Modes |
#1
|
|||
|
|||
![]() Service Module thermal control system must be fixed to allow EVA to proceed (seems like a relatively straightforward R&R, I hope we can confirm the fix quickly) Any more details about crew/MCC discussion of this problem and its resolution?? NASA: Station Status Report 25 March 2005 "Early today, a thermal control loop panel in Zvezda that provides cooling to the Pirs airlock failed, and its backup system was activated to provide the necessary cooling. There are two circulating pumps associated with each panel. Both pump panels are needed to provide adequate backup capability for the spacewalk. The crew will troubleshoot the pump panel early Saturday, and replace one or both of the pumps in the degraded panel." |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
SINFONI Opens with Upbeat Chords: First Observations with New VLTInstrument Hold Great Promise (Forwarded) | Andrew Yee | Astronomy Misc | 0 | August 25th 04 06:10 PM |
LSC Room 103, LCCV, UPRCV | Allen Thomson | Policy | 4 | February 5th 04 11:20 PM |
Gravitation and Maxwell's Electrodynamics, BOUNDARY CONDITIONS | [email protected] \(formerly\) | Astronomy Misc | 273 | December 28th 03 10:42 PM |
Unofficial Space Shuttle Manifest | Steven S. Pietrobon | Space Shuttle | 0 | October 6th 03 02:59 AM |
Unofficial Space Shuttle Manifest | Steven S. Pietrobon | Space Shuttle | 0 | September 12th 03 01:37 AM |