Thread Tools | Display Modes |
#1
|
|||
|
|||
![]()
Melissa Mathews
Headquarters, Washington July 22, 2005 (Phone: 202/358-1272) Jessica Rye Kennedy Space Center, Fla. (Phone: 321/867-2468) RELEASE: 05-198 RETURN TO FLIGHT LAUNCH COUNTDOWN BEGINS AGAIN SATURDAY NASA will begin the countdown for the second Return to Flight launch attempt of Space Shuttle Discovery at noon EDT, July 23, 70 hours before the targeted liftoff. On mission STS-114, Discovery's seven-member crew will test new equipment and procedures to increase the safety of the Space Shuttle and deliver supplies to the International Space Station. NASA's Kennedy Space Center (KSC) launch team will conduct the countdown from Firing Room 3 of the Launch Control Center. The countdown includes nearly 28 hours of built-in hold time, leading to a preferred launch time at about 10:39 a.m. EDT July 26. The launch opportunity lasts for about five minutes. This mission is the 114th Shuttle flight and 17th U.S. flight to the Station. The 12-day mission has a planned KSC landing at approximately 5:46 a.m. EDT, Aug. 7. For detailed information about NASA's Return to Flight visit: http://www.nasa.gov/returntoflight COUNTDOWN MILESTONES (ALL TIMES EDT & SUBJECT TO CHANGE) Launch-3 Days (Saturday, July 23): Countdown begins at the T-43 hours (12:20 p.m.) Launch-2 Days (Sunday, July 24) Complete preparation to load power-reactant storage and distribution system (3 a.m.); activate and test navigational systems; flight deck preliminary inspections complete (4 a.m.). Enter first built-in hold at T-27 hours for four hours (4 a.m.). Resume countdown (8 a.m.); begin operations to load cryogenic reactants into Discovery's fuel cell storage tanks (9:30 p.m.). Enter 4-hour built-in hold at T-19 hours (4 p.m.). Resume countdown (8 p.m.). Launch-1 Day (Monday, July 25) Pad sound suppression system water tank filling complete (12 a.m.). Enter planned hold at T-11 hours for 13 hours, 44 minutes (4 a.m.); begin star tracker functional checks (4:50 a.m.); move Rotating Service Structure to the park position (1 p.m.) Resume countdown at T-11 hours (6:44 p.m.) Enter planned two-hour built-in hold at T-6 hours (10:44 p.m.) Launch Day (Tuesday, July 26) Verification of launch commit criteria prior to cryogenic loading of External Tank (ET). Resume countdown (12:44 a.m.); load ET with 500,000 gallons of cryogenic propellants (about 12:54 a.m.-3:54 a.m.); final Inspection Team to launch pad. Enter planned 3-hour built-in hold at T-3 hours (3:44 a.m.); perform inertial measurement unit preflight calibration; align Merritt Island Launch Area tracking antennas. Resume countdown at T-3 hours (6:44 a.m.); crew departs Operations and Checkout Building for the pad (6:49 a.m.); crew entry into orbiter (approx. 7:19 a.m.); begin to close Discovery's crew hatch (about 8:24 a.m.). Enter planned 10-minute hold at T-20 minutes (9:24 a.m.); NASA Test Director conducts final launch team briefings; inertial measurement unit preflight alignments Resume countdown at T-20 minutes (9:34 a.m.); transition the Orbiter's onboard computers to launch configuration; backup flight system to launch configuration. Enter estimated 40-minute hold at T-9 minutes (9:45 a.m.); launch director, Mission Management Team and NASA test director conduct final polls for go/no-go to launch. Resume countdown at T-9 minutes (about 10:25 a.m.); start automatic ground launch sequencer (T-9:00 minutes); retract orbiter crew access arm (T-7:30); ignition of three Shuttle main engines (T-6.6 seconds); Solid Rocket Booster ignition and liftoff (T-0) STS-114 CREW & LAUNCH DAY ACTIVITIES (TV events (#)-times may vary) Commander Eileen Collins; pilot James Kelly; payload commander Soichi Noguchi; mission specialists Stephen Robinson, Andrew Thomas, Wendy Lawrence, Charles Camarda 12:30 a.m. Crew wake up #5 a.m. Crew photo #6:20 a.m. Suit up 6:30 a.m. Weather briefing #6:49 a.m. Walkout #7:19 a.m. Arrive at pad #8:34 a.m. Close hatch For NASA TV schedules, viewing and information on the Web, visit: http://www.nasa.gov/ntv -end- -- -------------- Jacques :-) www.spacepatches.info |
#2
|
|||
|
|||
![]() "Jacques van Oene" wrote in message . .. Launch-1 Day (Monday, July 25) Pad sound suppression system water tank filling complete (12 a.m.). Question: Why do they have to re-fill the water tank? They never used it when the first launch attempt was scrubbed, so doesn't it still contain the water from that launch attempt? JD |
#3
|
|||
|
|||
![]() "Joe Delphi" wrote in message news:GosEe.104096$Qo.56906@fed1read01... "Jacques van Oene" wrote in message . .. Question: Why do they have to re-fill the water tank? They never used it when the first launch attempt was scrubbed, so doesn't it still contain the water from that launch attempt? JD I'm sure even at LC39 people have to use the toilet on occassion and I see no need for a seperate water tower for sanitary and sound suppression. So I'm sure that there is a checklist item for "Is water tank full?" and if not "fill tank, to be complete NLT X hour". |
#4
|
|||
|
|||
![]()
"Joe Delphi" wrote in
news:GosEe.104096$Qo.56906@fed1read01: "Jacques van Oene" wrote in message . .. Launch-1 Day (Monday, July 25) Pad sound suppression system water tank filling complete (12 a.m.). Question: Why do they have to re-fill the water tank? Maybe they dont. It looks like the media people at NASA have just taken the old press release from July 9th, changed a few dates and re-released it once more. |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Return to Flight | Eric Chomko | Policy | 0 | July 1st 05 05:10 PM |
NASA's Discovery Rolls to Major Return To Flight Milestone | Jacques van Oene | Space Shuttle | 0 | March 29th 05 05:38 PM |
NASA centers support Shuttle return to flight | Jacques van Oene | Space Shuttle | 0 | September 9th 04 11:49 PM |
SS1 flight set for June 21 | Hop David | Policy | 127 | June 16th 04 07:50 AM |
NASA Names Return To Flight Task Group Members | Ron Baalke | Space Shuttle | 0 | July 25th 03 11:16 PM |