Delta IV Heavy - FRF?
"Greg D. Moore (Strider)" wrote in message
...
As Brian said, I think 4 months sounds about right. However, I suspect
he's
not counting Enterprise which was used for a lot of testing also.
There's also the fact of Boeing's single-shift operations, versus 3-shift
operations at 39. And head count is a lot lower for the bodies doing the
work.
-Kim-
|